BRYTON POWER LLC
How many solar installs has BRYTON POWER LLC done in California, and which license number is on its installs?
BRYTON POWER LLC has 1,067 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Sep 13, 2023 to Jun 9, 2026), most of them in San Bernardino County (320), Kern County (278) and Riverside County (143). The license number recorded on most of its installs, 826729, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 1,067
- Last 24 months
- 923
- Total capacity
- 7,710 kW DC
- Median system size
- 6.6 kW DC
- With battery storage
- 95.6% all time; 97.9% last 24 months
- Third-party owned
- 81.7% of 1,067 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1,049 installs, latest Jun 9, 2026
- Ownership types recorded
- PPA 863, lease 4, other 5
- Median battery size
- 5 kWh (660 installs list a capacity)
- First install
- Sep 13, 2023
- Latest install
- Jun 9, 2026
- Counties
- 30
- Utilities
- SCE 679, PGE 388
- CSLB license
- 826729
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2023 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2023 | 6 | 0 |
| 2024 | 351 | 324 |
| 2025 | 684 | 671 |
| 2026 (through Aug 31, 2026) | 26 | 25 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1,049 of its 1,067 interconnected installs (98.3% of the 1,067 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.7% of those include battery storage. The latest Net Billing Tariff install was approved Jun 9, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 5 | 0.5% | not counted |
| NEM 2.0 | 13 | 1.2% | 11 (84.6%) |
| Net Billing Tariff | 1,049 | 98.3% | 1,004 (95.7%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 872 of BRYTON POWER LLC’s installs the utility recorded a third-party ownership type: PPA 863, lease 4, prepaid lease 0, other 5. Across all installers, 17 residential systems list a third-party owner name that matches BRYTON POWER LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| EnFin | 251 |
| LightReach | 247 |
| Everbright Empower | 151 |
| Everbright | 134 |
| GoodLeap | 40 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 864 of BRYTON POWER LLC’s 923 installs name a module maker in the “Generator Manufacturer” fields, and most of those (500, 57.9%) used modules recorded as Qcells.
In the last 24 months, 923 of BRYTON POWER LLC’s 923 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (909, 98.5%) used inverters recorded as Enphase.
In the last 24 months, 845 of BRYTON POWER LLC’s 923 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (824, 97.5%) used batteries recorded as Enphase.
953 of 1,020 battery-paired PG&E and SCE installs (93.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 500 | 539 |
| Canadian Solar | 335 | 433 | |
| VSUN (Vietnam Sunergy) | 37 | 37 | |
| SunPower | 30 | 32 | |
| Mission Solar | 23 | 23 | |
| Inverter maker | Enphase | 909 | 1,053 |
| SolarEdge | 114 | 126 | |
| ABB | 29 | 32 | |
| SMA | 23 | 24 | |
| SunPower | 15 | 16 | |
| Battery maker | Enphase | 824 | 932 |
| SolarEdge | 13 | 13 | |
| Tesla | 9 | 9 | |
| Enpahse Energy | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 997 of 1,067 installs, inverters on 1,067. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 826729 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 1,067 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (1,067 of 1,067 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- BRYTON: 76 installs, license 826729
Counties
| County | Installs |
|---|---|
| San Bernardino | 320 |
| Kern | 278 |
| Riverside | 143 |
| Tulare | 109 |
| Fresno | 104 |
| Los Angeles | 30 |
| Orange | 16 |
| San Joaquin | 10 |
| Kings | 6 |
| Madera | 6 |
| Yuba | 6 |
| Inyo | 5 |
| Contra Costa | 4 |
| Plumas | 4 |
| Sutter | 4 |
| Mono | 3 |
| Tuolumne | 3 |
| Alameda | 2 |
| Calaveras | 2 |
| Placer | 2 |
| Butte | 1 |
| Merced | 1 |
| Napa | 1 |
| Nevada | 1 |
| San Benito | 1 |
| Santa Clara | 1 |
| Santa Cruz | 1 |
| Solano | 1 |
| Sonoma | 1 |
| Yolo | 1 |
Top cities
| City | Installs |
|---|---|
| Bakersfield | 130 |
| Fresno | 81 |
| San Bernardino | 57 |
| Fontana | 56 |
| Ontario | 44 |
| Delano | 41 |
| Porterville | 38 |
| Cathedral City | 29 |
| Hesperia | 29 |
| Taft | 28 |
| Rialto | 26 |
| Moreno Valley | 24 |
| Lamont | 20 |
| Arvin | 19 |
| Victorville | 19 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| BRYTON POWER LLC | 1,067 |
Common questions
Where does BRYTON POWER LLC install solar?
Its installs are spread across 30 counties. The most are in San Bernardino County (320 installs), followed by Kern County (278).
How often does BRYTON POWER LLC install batteries with solar?
95.6% of its interconnected solar installs include battery storage across all years, and 97.9% in the last 24 months (904 of 923).
How many BRYTON POWER LLC installs are under NEM 3.0 (the Net Billing Tariff)?
1,049 of its 1,067 interconnected installs (98.3% of the 1,067 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.