Solar installers in Highland, California
Most installs here are in San Bernardino County.
Who installs the most solar in Highland?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Highland are Sunrun (257), SunPower (46) and Tesla Energy Operations (formerly SolarCity) (39). They account for 342 of the 706 residential solar installs interconnected there in that window.
In all, 4,313 homes in Highland have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 107 installers with installs in this window. 9 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 631 | 631 |
| 2 | SunPower | 326 | 326 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 280 | 280 |
| 4 | Vivint Solar Developer, LLC | 226 | 226 |
| 5 | Horizon Solar Power | 177 | 177 |
| 6 | Bright Planet Solar | 142 | 142 |
| 7 | FREEDOM FOREVER LLC | 134 | 134 |
| 8 | Complete Solar | 82 | 82 |
| 9 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 81 | 81 |
| 10 | Current Home | 80 | 80 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 525 | 45 |
| 2023 | 644 | 86 |
| 2024 | 377 | 251 |
| 2025 | 363 | 304 |
| 2026 (through Aug 31, 2026) | 216 | 167 |
Under the Net Billing Tariff (NEM 3.0)
860 of the 4,313 residential solar installs in Highland (19.9% of the 4,313 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.0% of those include battery storage. The latest was approved Aug 26, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Highland
| 1 | Sunrun | 311 | 290 | 93.2% |
| 2 | BRIGHT OPS | 48 | 43 | 89.6% |
| 3 | FREEDOM FOREVER LLC | 44 | 43 | 97.7% |
| 4 | V3 Electric | 42 | 42 | 100.0% |
| 5 | Tesla Energy Operations (formerly SolarCity) | 38 | 36 | 94.7% |
| 6 | Bright Planet Solar | 26 | 8 | 30.8% |
| 7 | Current Home | 24 | 24 | 100.0% |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 16 | 10 | 62.5% |
| 9 | LIFESTYLE SOLAR ELECTRIC | 15 | 0 | 0.0% |
| 10 | LIFESTYLE SOLAR INC | 11 | 0 | 0.0% |
| 11 | Semper Solaris Construction Inc | 11 | 11 | 100.0% |
| 12 | SunPower | 11 | 5 | 45.5% |
| 13 | BETTER EARTH ELECTRIC INC | 10 | 10 | 100.0% |
| 14 | BRYTON POWER LLC | 9 | 9 | 100.0% |
| 15 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 9 | 6 | 66.7% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 699 of Highland’s 706 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (343, 49.1%) used modules recorded as Qcells.
In the last 24 months, 706 of Highland’s 706 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (316, 44.8%) used inverters recorded as Enphase.
In the last 24 months, 559 of Highland’s 706 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (304, 54.4%) used batteries recorded as Tesla.
931 of 960 battery-paired PG&E and SCE installs (97.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 343 | 1,058 |
| JA Solar | 94 | 254 | |
| LONGi | 81 | 365 | |
| Silfab | 49 | not in top list | |
| Canadian Solar | 43 | 332 | |
| Inverter maker | Enphase | 316 | 1,561 |
| Tesla | 261 | 336 | |
| SolarEdge | 168 | 1,454 | |
| SunPower | 13 | 369 | |
| Delta Electronics | 10 | not in top list | |
| Battery maker | Tesla | 304 | 428 |
| Enphase | 155 | 218 | |
| SolarEdge | 81 | 138 | |
| FranklinWH | 14 | 23 | |
| LG | 4 | 110 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,633 of 4,313 installs, inverters on 4,312. See the methodology and the equipment index.
ZIP codes in Highland
ZIP codes with their own page where the utilities recorded Highland on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92346 | 4,281 | 4,311 | 713 |
SGIP battery storage projects in Highland
The SGIP report lists 128 battery storage projects with the city Highland, 61 with the status Paid ($418,093 in current incentive allocations, 878 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 61 | 878 | $418,093 |
| PBI in Process | 4 | 5,348 | $3,817,359 |
| Reserved | 13 | 631 | $249,317 |
| Pending Reservation | 10 | 780 | $178,010 |
| Waitlist | 3 | 40 | $70,406 |
| Cancelled | 36 | 2,714 | $2,133,420 |
| RRF Rejected | 1 | 9 | $1,354 |
Installers named on the most SGIP storage projects in Highland
7 of the 128 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Highland is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 4,313
- Last 24 months
- 706
- Capacity
- 31.2 MW DC
- Median system size
- 6.6 kW DC
- With battery storage
- 22.3% all time; 80.0% last 24 months
- Third-party owned
- 45.8% where reported
- Ownership types recorded
- PPA 1,437, lease 324, prepaid lease 2, other 104
- Median battery size
- 13.5 kWh
- Earliest install in data
- Feb 21, 2001
Common questions
How many homes in Highland have solar?
4,313 residential solar systems in Highland were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 706 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Highland?
107 installer names have at least one install interconnected in Highland in the last 24 months, and 459 appear in the full record.
How common are batteries with new solar in Highland?
22.3% of the solar installs interconnected in Highland include battery storage across all years, and 80.0% in the last 24 months (565 of 706).
How many solar installs in Highland are under NEM 3.0?
860 of the 4,313 residential solar installs in Highland (19.9% of the 4,313 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.