Solar Optimum Inc.

How many solar installs has Solar Optimum Inc. done in California, and which license number is on its installs?

Solar Optimum Inc. has 10,616 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Apr 29, 2011 to Aug 31, 2026), most of them in Los Angeles County (2,731), Orange County (1,354) and San Diego County (1,243). CSLB lists license 972228 (SOLAR OPTIMUM DESIGN & ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
10,616
Last 24 months
1,772
Total capacity
85,515.2 kW DC
Median system size
7.6 kW DC
With battery storage
36.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 87.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.0% of 10,595 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2,209 installs, latest Aug 31, 2026
Ownership types recorded
PPA 48, lease 29, prepaid lease 34
Median battery size
13.5 kWh (2,520 installs list a capacity)
First install
Apr 29, 2011
Latest install
Aug 31, 2026
Counties
38
Utilities
SCE 5,736, PGE 3,391, SDGE 1,489
CSLB license
972228

Is Solar Optimum Inc. still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (996 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201230
201370
2014120
2015440
2016580
20177712
201826257
201960691
2020942205
20211,189223
20222,272358
20232,789538
2024834581
2025884724
2026 (through Aug 31, 2026)636544

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2,209 of its 10,616 interconnected installs (20.8% of the 10,615 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01961.8%not counted
NEM 2.08,21077.3%1,507 (21.9%)
Net Billing Tariff2,20920.8%1,789 (87.3%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 111 of Solar Optimum Inc.’s installs the utility recorded a third-party ownership type: PPA 48, lease 29, prepaid lease 34, other 0. Across all installers, 8 residential systems list a third-party owner name that matches Solar Optimum Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Superior Solar Leasing LP29
Participate Holdings, LLC20
Sunrun20
Participate Energy11
Solar Optimum Inc.8

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1,740 of Solar Optimum Inc.’s 1,772 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (661, 38.0%) used modules recorded as Panasonic.

In the last 24 months, 1,771 of Solar Optimum Inc.’s 1,772 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,099, 62.1%) used inverters recorded as Tesla.

In the last 24 months, 1,340 of Solar Optimum Inc.’s 1,772 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,097, 81.9%) used batteries recorded as Tesla.

3,137 of 3,333 battery-paired PG&E and SCE installs (94.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic6615,900
Qcells460592
REC2331,668
Mission Solar216231
JA Solar114not in top list
Inverter makerTesla1,0991,734
Enphase6686,633
Panasonic41not in top list
SolarEdge331,549
SunPower19327
Battery makerTesla1,0972,280
Enphase242851
FranklinWH11
LG12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 10,258 of 10,616 installs, inverters on 10,615. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Optimum Inc. as developer on 2,848 battery storage projects and as installer on 2,716 (2,708 name it as both), 2,856 projects in all with 47,019 kWh of storage. 1,816 have the status Paid, with $11,442,801 in current incentive allocations. Applications were received from May 1, 2017 to Mar 30, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1,81630,487$11,442,801
PBI in Process1236$70,904
Reserved1301,704$1,964,205
Pending Reservation40546$1,401,212
Waitlist771,015$2,535,176
Cancelled71912,115$5,865,493
RRF Rejected73917$148,207

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage2,04730,348$5,985,6841,471$4,344,129
Equity Resiliency3909,361$8,808,606284$6,493,780
Large-Scale Storage1163,369$809,99452$350,827
Residential Solar and Storage Equity - AB 2091141,498$3,703,4821$28,572
Residential Solar and Storage Equity - AB 209 Non-POU1131,487$3,887,4748$225,494
Residential Solar and Storage Equity - AB 209 POU226$78,7520$0
Residential Storage Equity113$5,8000$0
Not stated73917$148,2070$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
972228SOLAR OPTIMUM DESIGN & ELECTRICAL (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical ContractorApr 19, 2012Apr 30, 202810,580

License numbers are the ones the utilities recorded on the interconnection applications (10,611 of 10,616 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 972228. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Optimum Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco972228021110000014
unincorporated San Diego County9722281032173339465131196
unincorporated Marin County97222800860000014

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles2,731
Orange1,354
San Diego1,243
Santa Clara1,050
Riverside678
Alameda659
San Bernardino634
Contra Costa538
Ventura482
San Mateo330
Marin137
San Joaquin125
Solano118
Kern103
Santa Barbara57
Sonoma56
Yolo50
Placer44
El Dorado36
Santa Cruz35
Fresno20
Napa20
San Benito18
San Francisco12
Tulare12
Calaveras11
San Luis Obispo11
Merced9
Nevada8
Stanislaus8
Monterey6
Yuba6
Kings4
Madera4
Butte3
Amador2
Mariposa1
Tuolumne1

Top cities

CityInstalls
San Jose599
San Diego565
Irvine172
Fremont156
Long Beach124
Simi Valley123
Arcadia119
Chula Vista115
La Canada106
Santa Clarita104
Corona98
Torrance93
Mission Viejo88
San Ramon82
Huntington Beach80

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR OPTIMUM DESIGN & ELECTRICAL7,763
Solar Optimum Inc.1,703
SOLAR OPTIMUM INC626
Solar Optimum Inc485
SOLAR OPTIMUM INC.33
SOLAR OPTIMUM4
Solar Optimum1
SOLAR-OPTIMUM-DESIGN-&-ELECTRICAL1

Common questions

Where does Solar Optimum Inc. install solar?

Its installs are spread across 38 counties. The most are in Los Angeles County (2,731 installs), followed by Orange County (1,354).

How often does Solar Optimum Inc. install batteries with solar?

36.5% of its interconnected solar installs include battery storage across all years, and 87.9% in the last 24 months (1,469 of 1,672). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar Optimum Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

2,209 of its 10,616 interconnected installs (20.8% of the 10,615 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.