LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC

How many solar installs has LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC done in California, and which license number is on its installs?

LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC has 2,742 residential solar installs interconnected in California, active in the records from 2023 through 2026 (May 25, 2023 to Aug 31, 2026), most of them in San Bernardino County (713), Riverside County (545) and Los Angeles County (464). CSLB lists license 1099095 (LGCY ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,742
Last 24 months
1,962
Total capacity
18,213.6 kW DC
Median system size
5.8 kW DC
With battery storage
66.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 78.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
74.1% of 2,735 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2,455 installs, latest Aug 31, 2026
Ownership types recorded
PPA 1,080, lease 172, prepaid lease 1, other 773
Median battery size
13.5 kWh (1,440 installs list a capacity)
First install
May 25, 2023
Latest install
Aug 31, 2026
Counties
35
Utilities
SCE 2,052, SDGE 514, PGE 176
CSLB license
1099095

Is LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1,445 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
20231833
2024776332
2025629411
2026 (through Aug 31, 2026)1,154740

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2,455 of its 2,742 interconnected installs (89.8% of the 2,735 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.028010.2%10 (4.7%)
Net Billing Tariff2,45589.8%1,476 (73.3%)
Not recorded7

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2,026 of LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 1,080, lease 172, prepaid lease 1, other 773. Across all installers, 24 residential systems list a third-party owner name that matches LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
GOODLEAP635
Sunnova Energy Corporation265
EVERBRIGHT250
Enfin Corp213
LGCY209

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1,916 of LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC’s 1,962 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,718, 89.7%) used modules recorded as Qcells.

In the last 24 months, 1,955 of LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC’s 1,962 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,053, 53.9%) used inverters recorded as Enphase.

In the last 24 months, 1,191 of LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC’s 1,962 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (604, 50.7%) used batteries recorded as Tesla.

1,405 of 1,486 battery-paired PG&E and SCE installs (94.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1,7181,809
Canadian Solar141227
REC47390
LONGi23not in top list
Q.Home Core20not in top list
Inverter makerEnphase1,0531,633
Tesla708729
SolarEdge148304
Qcells132132
ABB19not in top list
Battery makerTesla604604
Enphase541755
SolarEdge4242
Q Cell22
Qcells22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,666 of 2,742 installs, inverters on 2,735. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC as developer on 1 battery storage project and as installer on 2 (0 name it as both), 3 projects in all with 42 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 10, 2024 to Nov 11, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled342$39,265

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Storage Equity213$10,7110$0
Equity Resiliency129$28,5540$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1099095LGCY ELECTRIC (Limited Liability)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorNov 28, 2022Nov 30, 20282,734

License numbers are the ones the utilities recorded on the interconnection applications (2,734 of 2,742 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1099095. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023202420252026Total
unincorporated San Diego County1099095372535139236

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino713
Riverside545
Los Angeles464
San Diego454
Orange246
Kern65
Contra Costa54
Inyo35
Tulare28
Solano20
Alameda13
Ventura13
Sonoma12
Napa11
San Joaquin8
Santa Clara8
Mono7
Butte6
Kings6
Placer6
El Dorado5
Fresno5
Yolo3
Lake2
Santa Barbara2
Sutter2
Glenn1
Madera1
Marin1
Merced1
Monterey1
San Mateo1
Santa Cruz1
Shasta1
Yuba1

Top cities

CityInstalls
Fontana212
San Diego177
Chino69
Lancaster63
Victorville53
Chula Vista50
Blythe46
Murrieta45
Hemet44
Loma Linda44
Whittier41
Hesperia40
Riverside39
San Clemente38
Norwalk37

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC1,281
LGCY ELECTRIC945
LGCY INSTALLATION SERVICES514
LGCY Installation Services LLC1
LGCY INSTALLATION SERVICES LLC1

Common questions

Where does LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC install solar?

Its installs are spread across 35 counties. The most are in San Bernardino County (713 installs), followed by Riverside County (545).

How often does LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC install batteries with solar?

66.7% of its interconnected solar installs include battery storage across all years, and 78.6% in the last 24 months (1,271 of 1,617). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

2,455 of its 2,742 interconnected installs (89.8% of the 2,735 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.