SUNNOVA ENERGY CORPORATION

How many solar installs has SUNNOVA ENERGY CORPORATION done in California, and which license number is on its installs?

SUNNOVA ENERGY CORPORATION has 16,057 residential solar installs interconnected in California, active in the records from 2014 through 2026 (May 15, 2014 to Aug 27, 2026), most of them in Riverside County (6,455), San Bernardino County (4,421) and Los Angeles County (2,027). The license number recorded on most of its installs, 1003498, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
16,057
Last 24 months
4,181
Total capacity
62,022.2 kW DC
Median system size
3.7 kW DC
With battery storage
25.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 61.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
97.8% of 16,056 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4,918 installs, latest Jul 8, 2026
Ownership types recorded
PPA 15,651, lease 41, prepaid lease 1, other 3
Median battery size
13.5 kWh (3,866 installs list a capacity)
First install
May 15, 2014
Latest install
Aug 27, 2026
Counties
36
Utilities
SCE 15,535, PGE 514, SDGE 8
CSLB license
1003498

Is Sunnova still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (75 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201420
201550
201610
201720
201800
201900
2020115
20211,4451
20223,5900
20233,48675
20245,4022,742
20252,0871,271
2026 (through Aug 31, 2026)2615

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4,918 of its 16,057 interconnected installs (30.6% of the 16,057 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 8, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0150.1%not counted
NEM 2.011,12469.3%731 (6.6%)
Net Billing Tariff4,91830.6%3,371 (68.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 15,696 of SUNNOVA ENERGY CORPORATION’s installs the utility recorded a third-party ownership type: PPA 15,651, lease 41, prepaid lease 1, other 3. Across all installers, 13,460 residential systems list a third-party owner name that matches SUNNOVA ENERGY CORPORATION exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova Energy Corporation8,709
Lennar Homes6,029
Lennar352
SUNNOVA78
Woodside Homes60

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4,089 of SUNNOVA ENERGY CORPORATION’s 4,181 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3,839, 93.9%) used modules recorded as Qcells.

In the last 24 months, 4,181 of SUNNOVA ENERGY CORPORATION’s 4,181 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3,901, 93.3%) used inverters recorded as Enphase.

In the last 24 months, 2,526 of SUNNOVA ENERGY CORPORATION’s 4,181 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,524, 60.3%) used batteries recorded as Tesla.

4,077 of 4,109 battery-paired PG&E and SCE installs (99.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3,83912,795
Canadian Solar183202
LG352,374
LONGi1124
REC713
Inverter makerEnphase3,9019,856
Tesla246710
SolarEdge1934,073
SunPower331,067
FranklinWH18not in top list
Battery makerTesla1,5242,372
FranklinWH8101,148
Enphase189552
SolarEdge34

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 15,475 of 16,057 installs, inverters on 16,057. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNNOVA ENERGY CORPORATION as developer on 108 battery storage projects and as installer on 8 (7 name it as both), 109 projects in all with 1,675 kWh of storage. 6 have the status Paid, with $79,595 in current incentive allocations. Applications were received from Nov 18, 2019 to May 16, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid6140$79,595
Reserved126$3,960
Cancelled971,443$741,683
RRF Rejected566$9,520

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage52746$111,2974$10,695
Residential Storage Equity35511$402,3470$0
Equity Resiliency16313$302,8942$68,900
Large-Scale Storage140$8,7000$0
Not stated566$9,5200$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1003498Not found in the CSLB License Master file pulled Nov 4, 202616,004

License numbers are the ones the utilities recorded on the interconnection applications (16,036 of 16,057 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SUNNOVA ENERGY CORPORATION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202320242025Total
City and County of San Francisco10034980415
unincorporated San Diego County1003498118120

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside6,455
San Bernardino4,421
Los Angeles2,027
Orange1,534
Kings354
Tulare353
Ventura335
Kern190
Fresno165
San Joaquin54
Alameda48
Madera26
Napa19
El Dorado9
Santa Clara9
Contra Costa8
San Diego8
Placer6
Santa Barbara5
Monterey4
Yolo4
Amador3
Solano3
San Benito2
San Francisco2
Sonoma2
Yuba2
Butte1
Humboldt1
Lake1
Merced1
Nevada1
San Mateo1
Santa Cruz1
Sutter1
Tuolumne1

Top cities

CityInstalls
Menifee1,570
Fontana1,374
Irvine1,197
Ontario1,100
Valencia995
Rialto697
Temecula645
Winchester633
Jurupa Valley585
Hemet562
Santa Clarita374
Murrieta338
Palm Desert323
Visalia299
Chino250

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNNOVA ENERGY CORPORATION15,937
Sunnova Energy Corporation108
Sunnova Energy Corp5
Sunnova Energy Corp.2
SUNNOVA-ENERGY-CORPORATION2
Sunnova Energy1
SUNNOVA ENERGY1
SUNNOVA ENERGY CORP1

Common questions

Where does SUNNOVA ENERGY CORPORATION install solar?

Its installs are spread across 36 counties. The most are in Riverside County (6,455 installs), followed by San Bernardino County (4,421).

How often does SUNNOVA ENERGY CORPORATION install batteries with solar?

25.6% of its interconnected solar installs include battery storage across all years, and 61.1% in the last 24 months (2,550 of 4,175). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUNNOVA ENERGY CORPORATION installs are under NEM 3.0 (the Net Billing Tariff)?

4,918 of its 16,057 interconnected installs (30.6% of the 16,057 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.