SUNFORCE ENERGY SOLUTIONS

How many solar installs has SUNFORCE ENERGY SOLUTIONS done in California, and which license number is on its installs?

SUNFORCE ENERGY SOLUTIONS has 284 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Dec 10, 2020 to Aug 31, 2026), most of them in San Bernardino County (279), Riverside County (3) and Los Angeles County (2). CSLB lists license 1041048 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
284
Last 24 months
145
Total capacity
1,129.5 kW DC
Median system size
3.1 kW DC
With battery storage
1.1% all time; 2.1% last 24 months
Third-party owned
0.0% of 284 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
233 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (3 installs list a capacity)
First install
Dec 10, 2020
Latest install
Aug 31, 2026
Counties
3
Utilities
SCE 284
CSLB license
1041048

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202150
2022180
2023460
2024910
2025682
2026 (through Aug 31, 2026)551

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

233 of its 284 interconnected installs (82.0% of the 284 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05118.0%0 (0.0%)
Net Billing Tariff23382.0%3 (1.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUNFORCE ENERGY SOLUTIONS’s installs. No residential system in the file lists a third-party owner name that matches SUNFORCE ENERGY SOLUTIONS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 145 of SUNFORCE ENERGY SOLUTIONS’ 145 installs name a module maker in the “Generator Manufacturer” fields, and most of those (126, 86.9%) used modules recorded as Aptos Solar.

In the last 24 months, 145 of SUNFORCE ENERGY SOLUTIONS’ 145 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (105, 72.4%) used inverters recorded as SolarEdge.

In the last 24 months, 3 of SUNFORCE ENERGY SOLUTIONS’ 145 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Tesla.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar126169
Canadian Solar778
Prism Solar Technologies55
Znshine3not in top list
Mission Solar2not in top list
Inverter makerSolarEdge105183
Enphase3482
Tesla69
Battery makerTesla33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 281 of 284 installs, inverters on 284. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1041048Sole owner license (name not shown)CLEARC-10 Electrical ContractorJun 22, 2018Jun 30, 2028284

License numbers are the ones the utilities recorded on the interconnection applications (284 of 284 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1041048. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino279
Riverside3
Los Angeles2

Top cities

CityInstalls
Hesperia109
Apple Valley79
Victorville31
Phelan24
Oak Hills20
Pinon Hills8
Lucerne Valley3
Fontana2
Adelanto1
Barstow1
Claremont1
Joshua Tree1
Jurupa Valley1
Nuevo1
Palmdale1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNFORCE ENERGY SOLUTIONS284

Common questions

Where does SUNFORCE ENERGY SOLUTIONS install solar?

Its installs are spread across 3 counties. The most are in San Bernardino County (279 installs), followed by Riverside County (3).

How often does SUNFORCE ENERGY SOLUTIONS install batteries with solar?

1.1% of its interconnected solar installs include battery storage across all years, and 2.1% in the last 24 months (3 of 145).

How many SUNFORCE ENERGY SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

233 of its 284 interconnected installs (82.0% of the 284 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.