GAF Energy

How many solar installs has GAF Energy done in California, and which license number is on its installs?

GAF Energy has 8,635 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 3, 2019 to Aug 31, 2026), most of them in San Diego County (1,231), San Bernardino County (1,161) and Riverside County (1,001). CSLB lists license 1062345 (G A F ENERGY LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
8,635
Last 24 months
8,112
Total capacity
37,097.2 kW DC
Median system size
4.2 kW DC
With battery storage
87.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
29.1% of 8,635 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5,969 installs, latest Aug 31, 2026
Ownership types recorded
PPA 3, lease 2,506
Median battery size
13.5 kWh (5,472 installs list a capacity)
First install
Oct 3, 2019
Latest install
Aug 31, 2026
Counties
40
Utilities
PGE 3,725, SCE 3,648, SDGE 1,262
CSLB license
1062345

Is GAF Energy still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (7,751 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201930
2020160
2021650
2022910
20232082
20242096
20251,9871,457
2026 (through Aug 31, 2026)6,0564,948

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5,969 of its 8,635 interconnected installs (69.1% of the 8,635 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.070.1%not counted
NEM 2.02,65930.8%2,055 (78.6%)
Net Billing Tariff5,96969.1%4,356 (91.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2,509 of GAF Energy’s installs the utility recorded a third-party ownership type: PPA 3, lease 2,506, prepaid lease 0, other 0. Across all installers, 2,506 residential systems list a third-party owner name that matches GAF Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
GAF Energy2,505
1712 Talus Way S Madera CA 936361
Back-up Power1
GAF1
GAF Energy LLLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8,098 of GAF Energy’s 8,112 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6,228, 76.9%) used modules recorded as Qcells.

In the last 24 months, 8,112 of GAF Energy’s 8,112 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5,395, 66.5%) used inverters recorded as Tesla.

In the last 24 months, 6,398 of GAF Energy’s 8,112 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5,533, 86.5%) used batteries recorded as Tesla.

6,398 of 6,413 battery-paired PG&E and SCE installs (99.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells6,2286,228
LONGi1,4911,491
GAF Energy LLC164426
GAF139219
GAFEnergyLLC37not in top list
Inverter makerTesla5,3955,403
Enphase3,1933,233
Delta Electronics349676
FranklinWH8787
SMA5not in top list
Battery makerTesla5,5335,533
FranklinWH835835
Enphase2424
sonnen68
Telsa11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 8,604 of 8,635 installs, inverters on 8,635. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GAF Energy as developer on 5 battery storage projects and as installer on 5 (5 name it as both), 5 projects in all with 102 kWh of storage. 2 have the status Paid, with $11,840 in current incentive allocations. Applications were received from Jan 19, 2024 to Dec 23, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid229$11,840
Reserved245$6,750
Cancelled128$5,109

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage359$8,7901$2,040
Equity Resiliency115$9,8001$9,800
Large-Scale Storage128$5,1090$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1062345G A F ENERGY LLC (Limited Liability)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJan 14, 2020Jan 31, 20288,630

License numbers are the ones the utilities recorded on the interconnection applications (8,634 of 8,635 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1062345. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GAF Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202020212022202320242025Total
City and County of San Francisco10623450003025
unincorporated San Diego County106234502243516
unincorporated Marin County10623451200003

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego1,231
San Bernardino1,161
Riverside1,001
Los Angeles680
San Joaquin606
Fresno600
Kern565
Orange536
Madera504
Yuba257
Placer201
Santa Clara187
El Dorado179
Kings152
Solano138
Ventura125
Alameda94
Sonoma66
Tulare60
Merced51
Contra Costa49
Yolo49
Marin40
San Mateo37
Napa23
Monterey7
Santa Cruz7
Nevada6
Butte4
San Francisco4
Calaveras2
Santa Barbara2
Sutter2
Tehama2
Tuolumne2
Amador1
Glenn1
Humboldt1
Mariposa1
San Luis Obispo1

Top cities

CityInstalls
Madera486
San Diego446
Ontario440
Fresno348
Irvine346
Shafter317
Rialto314
Menifee309
Oceanside279
Tracy273
Santa Clarita261
Plumas Lake248
Clovis247
Bakersfield244
Hesperia222

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
G A F ENERGY LLC7,201
GAF Energy1,360
GAF Energy LLC69
GAF ENERGY LLC3
G A F Energy LLC1
GAF Energy, LLC1

Common questions

Where does GAF Energy install solar?

Its installs are spread across 40 counties. The most are in San Diego County (1,231 installs), followed by San Bernardino County (1,161).

How often does GAF Energy install batteries with solar?

87.0% of its interconnected solar installs include battery storage across all years, and 92.8% in the last 24 months (6,408 of 6,905). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GAF Energy installs are under NEM 3.0 (the Net Billing Tariff)?

5,969 of its 8,635 interconnected installs (69.1% of the 8,635 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.