SOLARA HOME ENERGY LLC

How many solar installs has SOLARA HOME ENERGY LLC done in California, and which license number is on its installs?

SOLARA HOME ENERGY LLC has 2,683 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Aug 4, 2023 to Aug 27, 2026), most of them in Los Angeles County (699), Orange County (442) and San Joaquin County (339). CSLB lists license 1103958 (MARS BUILDER SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,683
Last 24 months
2,575
Total capacity
9,512.2 kW DC
Median system size
3.3 kW DC
With battery storage
34.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 36.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 2,683 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2,118 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
5 kWh (763 installs list a capacity)
First install
Aug 4, 2023
Latest install
Aug 27, 2026
Counties
18
Utilities
SCE 1,820, PGE 668, SDGE 195
CSLB license
1103958

Is SOLARA HOME ENERGY LLC still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1,368 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023410
202422910
20251,693566
2026 (through Aug 31, 2026)720291

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2,118 of its 2,683 interconnected installs (78.9% of the 2,683 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.056521.1%72 (12.7%)
Net Billing Tariff2,11878.9%795 (41.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLARA HOME ENERGY LLC’s installs. No residential system in the file lists a third-party owner name that matches SOLARA HOME ENERGY LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2,566 of SOLARA HOME ENERGY LLC’s 2,575 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (647, 25.2%) used modules recorded as Aptos Solar.

In the last 24 months, 2,575 of SOLARA HOME ENERGY LLC’s 2,575 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2,565, 99.6%) used inverters recorded as Enphase.

In the last 24 months, 861 of SOLARA HOME ENERGY LLC’s 2,575 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (838, 97.3%) used batteries recorded as Enphase.

865 of 867 battery-paired PG&E and SCE installs (99.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar647650
Qcells543546
LONGi480482
Znshine204204
Mission Solar164not in top list
Inverter makerEnphase2,5652,670
Tesla2730
SunPower22
Battery makerEnphase838838
Tesla2023
FranklinWH22
IQ BATTERY-5P1P-NA11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,674 of 2,683 installs, inverters on 2,683. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLARA HOME ENERGY LLC as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 5 kWh of storage. 1 have the status Paid, with $714 in current incentive allocations. Applications were received from Jul 19, 2025 to Jul 19, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid15$714

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage15$7141$714

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1103958MARS BUILDER SOLUTIONS (Limited Liability)CLEARB General Building Contractor; C-10 Electrical ContractorApr 25, 2023Apr 30, 20272,678

License numbers are the ones the utilities recorded on the interconnection applications (2,682 of 2,683 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1103958. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLARA HOME ENERGY LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242026Total
unincorporated San Diego County1103958183351

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles699
Orange442
San Joaquin339
Riverside309
San Bernardino269
San Diego195
Sonoma112
Ventura101
Placer90
Yolo53
Solano25
Amador19
Contra Costa19
Stanislaus6
Alameda2
El Dorado1
Marin1
Merced1

Top cities

CityInstalls
Lancaster560
Irvine370
Manteca336
Beaumont147
Temecula122
Santa Rosa112
Fontana100
Redlands83
Ontario77
Granite Bay64
Camarillo60
Pomona52
Woodland52
Chula Vista48
San Diego41

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARA HOME ENERGY LLC2,416
Solara Home Energy267

Common questions

Where does SOLARA HOME ENERGY LLC install solar?

Its installs are spread across 18 counties. The most are in Los Angeles County (699 installs), followed by Orange County (442).

How often does SOLARA HOME ENERGY LLC install batteries with solar?

34.8% of its interconnected solar installs include battery storage across all years, and 36.1% in the last 24 months (863 of 2,391). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLARA HOME ENERGY LLC installs are under NEM 3.0 (the Net Billing Tariff)?

2,118 of its 2,683 interconnected installs (78.9% of the 2,683 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.