Imperial Irrigation District: net-metered solar
How many net-metered solar customers does Imperial Irrigation District have?
Imperial Irrigation District reported 12,078 net-metered solar PV installations (11,728 residential) with 163.2 MW of PV capacity (reported in AC) to EIA for 2025. Its preliminary EIA-861M report for Aug 2026 lists 13,264 PV customers.
From EIA’s 2025 Form EIA-861 files, downloaded Nov 16, 2026. Figures are as the utility reported them to EIA.
- EIA utility number
- 9216
- Ownership type (EIA)
- Political Subdivision
- Capacity unit reported
- AC
- Balancing authority
- IID
- California counties served (EIA)
- Imperial, Riverside, San Diego
This utility’s customers are not in the PG&E, SCE and SDG&E interconnection records the installer pages on this site are built from.
Net-metered solar PV by sector, 2025
| Measure | Residential | Commercial | Industrial | Transportation | Total |
|---|---|---|---|---|---|
| PV installations | 11,728 | 350 | 12,078 | ||
| PV capacity MW | 89.601 | 73.607 | 163.208 |
Other net metering fields, 2025
- Energy sold back (MWh)
- 0
- Virtual net metering under 1 MW: customers
- 2,521
- Virtual net metering under 1 MW: capacity
- 6.826 MW
- Virtual net metering 1 MW and over: customers
- 0
- Virtual net metering 1 MW and over: capacity
- 0 MW
- PV-paired battery installations
- 0
- PV-paired battery capacity
- 0 MW
- PV-paired battery energy capacity (MWh)
- 0
- Batteries not paired with PV: installations
- 0
- Batteries not paired with PV: capacity
- 0 MW
Monthly EIA-861M reports, 2026
| Month | Data status | PV customers | Residential | PV capacity MW | PV-paired batteries |
|---|---|---|---|---|---|
| Jan 2026 | Preliminary | 12,204 | 11,847 | 165.548 | 0 |
| Feb 2026 | Preliminary | 12,310 | 11,945 | 167.328 | 0 |
| Mar 2026 | Preliminary | 12,498 | 12,131 | 168.738 | 0 |
| Apr 2026 | Preliminary | 12,711 | 12,343 | 170.538 | 0 |
| May 2026 | Preliminary | 12,883 | 12,510 | 172.128 | 0 |
| Jun 2026 | Preliminary | 13,021 | 12,644 | 173.328 | 0 |
| Jul 2026 | Preliminary | 13,147 | 12,762 | 175.348 | 0 |
| Aug 2026 | Preliminary | 13,264 | 12,876 | 176.598 | 0 |
From EIA’s EIA-861M net metering workbook for 2026, with the data status EIA prints on each row. Monthly figures come from EIA’s monthly survey and can differ from the annual Form EIA-861 numbers.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
All California utilities and EIA’s definitions, quoted.
Sources
- U.S. Energy Information Administration: Form EIA-861, Annual Electric Power Industry Report, detailed data files
- U.S. Energy Information Administration: Form EIA-861M, Monthly Electric Power Industry Report, net metering file
Records last pulled Nov 16, 2026. Every entry links to the original public record.