Solar installers in Palm Desert, California
Most installs here are in Riverside County.
Who installs the most solar in Palm Desert?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Palm Desert are Sunrun (340), Renova Energy Corp (111) and SUNLOGIX ENERGY INC (34). They account for 485 of the 1,043 residential solar installs interconnected there in that window.
In all, 8,407 homes in Palm Desert have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 111 installers with installs in this window. 29 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 340 | 949 |
| 2 | Renova Energy Corp | 111 | 2,288 |
| 3 | SUNLOGIX ENERGY INC | 34 | 283 |
| 4 | BRIGHT OPS | 31 | 41 |
| 5 | Citadel Roofing and Solar | 30 | 75 |
| 6 | FREEDOM FOREVER LLC | 25 | 92 |
| 7 | SUNLOGIX AC, HEATING , & SOLAR | 23 | 23 |
| 8 | Hot Purple Energy | 22 | 228 |
| 9 | SunPower | 21 | 134 |
| 10 | Tesla Energy Operations (formerly SolarCity) | 19 | 283 |
| 11 | Complete Solar | 18 | 26 |
| 12 | SUN CAPITAL ENERGY | 18 | 18 |
| 13 | MICHAEL SANDOVAL LLC DBA SUPREME SOLAR & ELECTRIC | 17 | 25 |
| 14 | Planet Solar Inc. | 15 | 222 |
| 15 | Current Home | 13 | 40 |
| 16 | GRID Alternatives | 13 | 104 |
| 17 | GOAT SOLAR INC | 12 | 12 |
| 18 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 12 | 13 |
| 19 | EXO Energy | 11 | 52 |
| 20 | JJ ENERGY INC | 11 | 22 |
| 21 | PACIFIC COAST GENERATION INC | 11 | 16 |
| 22 | AXIA SOLAR CORP | 10 | 10 |
| 23 | SOLAR TECH ENERGY SYSTEMS INC | 9 | 14 |
| 24 | Southern California Energy Alternatives | 9 | 128 |
| 25 | SolarMax Renewable Energy Provider, Inc | 8 | 35 |
Most installs, all time
| 1 | Renova Energy Corp | 2,288 | 2,288 |
| 2 | Sunrun | 949 | 949 |
| 3 | Vivint Solar Developer, LLC | 379 | 379 |
| 4 | SUNNOVA ENERGY CORPORATION | 323 | 323 |
| 5 | SUNLOGIX ENERGY INC | 283 | 283 |
| 6 | Tesla Energy Operations (formerly SolarCity) | 283 | 283 |
| 7 | Hot Purple Energy | 228 | 228 |
| 8 | Planet Solar Inc. | 222 | 222 |
| 9 | Horizon Solar Power | 139 | 139 |
| 10 | Bright Planet Solar | 136 | 136 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 1,076 | 105 |
| 2023 | 1,314 | 110 |
| 2024 | 632 | 351 |
| 2025 | 534 | 419 |
| 2026 (through Aug 31, 2026) | 353 | 292 |
Under the Net Billing Tariff (NEM 3.0)
1,370 of the 8,407 residential solar installs in Palm Desert (16.3% of the 8,407 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.4% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Palm Desert
| 1 | Sunrun | 377 | 305 | 80.9% |
| 2 | Renova Energy Corp | 201 | 172 | 85.6% |
| 3 | SUNLOGIX ENERGY INC | 60 | 54 | 90.0% |
| 4 | SUNNOVA ENERGY CORPORATION | 56 | 2 | 3.6% |
| 5 | SunPower | 45 | 33 | 73.3% |
| 6 | BRIGHT OPS | 41 | 36 | 87.8% |
| 7 | Citadel Roofing and Solar | 33 | 0 | 0.0% |
| 8 | EXO Energy | 30 | 9 | 30.0% |
| 9 | FREEDOM FOREVER LLC | 28 | 26 | 92.9% |
| 10 | MICHAEL SANDOVAL LLC DBA SUPREME SOLAR & ELECTRIC | 22 | 20 | 90.9% |
| 11 | Hot Purple Energy | 21 | 20 | 95.2% |
| 12 | SUNLOGIX AC, HEATING , & SOLAR | 21 | 20 | 95.2% |
| 13 | Tesla Energy Operations (formerly SolarCity) | 21 | 21 | 100.0% |
| 14 | Complete Solar | 18 | 0 | 0.0% |
| 15 | Planet Solar Inc. | 17 | 13 | 76.5% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 1,039 of Palm Desert’s 1,043 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (355, 34.2%) used modules recorded as Qcells.
In the last 24 months, 1,043 of Palm Desert’s 1,043 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (512, 49.1%) used inverters recorded as Tesla.
In the last 24 months, 792 of Palm Desert’s 1,043 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (594, 75.0%) used batteries recorded as Tesla.
1,382 of 1,443 battery-paired PG&E and SCE installs (95.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 355 | 1,495 |
| LONGi | 152 | 484 | |
| JA Solar | 114 | 270 | |
| SunPower | 93 | 2,149 | |
| REC | 83 | 380 | |
| Inverter maker | Tesla | 512 | 669 |
| Enphase | 338 | 2,909 | |
| SolarEdge | 163 | 2,209 | |
| SunPower | 23 | 1,170 | |
| Qcells | 17 | not in top list | |
| Battery maker | Tesla | 594 | 819 |
| Enphase | 68 | 110 | |
| SolarEdge | 58 | 95 | |
| FranklinWH | 31 | 35 | |
| LG | 26 | 137 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6,855 of 8,407 installs, inverters on 8,396. See the methodology and the equipment index.
ZIP codes in Palm Desert
ZIP codes with their own page where the utilities recorded Palm Desert on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Palm Desert
The SGIP report lists 257 battery storage projects with the city Palm Desert, 184 with the status Paid ($883,941 in current incentive allocations, 3,622 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 184 | 3,622 | $883,941 |
| Reserved | 11 | 3,193 | $2,611,684 |
| Pending Reservation | 3 | 53 | $111,738 |
| Waitlist | 2 | 26 | $55,868 |
| Cancelled | 52 | 2,116 | $643,859 |
| RRF Rejected | 5 | 53 | $9,116 |
Installers named on the most SGIP storage projects in Palm Desert
13 of the 257 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Palm Desert is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 8,407
- Last 24 months
- 1,043
- Capacity
- 80.3 MW DC
- Median system size
- 8.5 kW DC
- With battery storage
- 17.2% all time; 78.2% last 24 months
- Third-party owned
- 46.4% where reported
- Ownership types recorded
- PPA 2,000, lease 1,312, prepaid lease 4, other 224
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jun 29, 2001
Common questions
How many homes in Palm Desert have solar?
8,407 residential solar systems in Palm Desert were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,043 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Palm Desert?
111 installer names have at least one install interconnected in Palm Desert in the last 24 months, and 501 appear in the full record.
How common are batteries with new solar in Palm Desert?
17.2% of the solar installs interconnected in Palm Desert include battery storage across all years, and 78.2% in the last 24 months (816 of 1,043).
How many solar installs in Palm Desert are under NEM 3.0?
1,370 of the 8,407 residential solar installs in Palm Desert (16.3% of the 8,407 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.