Solar installers in Eastvale, California
Most installs here are in Riverside County.
Who installs the most solar in Eastvale?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Eastvale are Sunrun (403), Tesla Energy Operations (formerly SolarCity) (107) and Complete Solar (87). They account for 597 of the 880 residential solar installs interconnected there in that window.
In all, 5,006 homes in Eastvale have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 81 installers with installs in this window. 6 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 772 | 772 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 717 | 717 |
| 3 | SunPower | 574 | 574 |
| 4 | SunStreet Energy Group LLC | 471 | 471 |
| 5 | Lennar Homes/Sunstreet Energy | 125 | 125 |
| 6 | FREEDOM FOREVER LLC | 123 | 123 |
| 7 | Complete Solar | 102 | 102 |
| 8 | SolarMax Renewable Energy Provider, Inc | 97 | 97 |
| 9 | Vivint Solar Developer, LLC | 86 | 86 |
| 10 | Bright Planet Solar | 76 | 76 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 718 | 87 |
| 2023 | 782 | 168 |
| 2024 | 288 | 235 |
| 2025 | 442 | 325 |
| 2026 (through Aug 31, 2026) | 337 | 287 |
Under the Net Billing Tariff (NEM 3.0)
1,088 of the 5,006 residential solar installs in Eastvale (21.7% of the 5,006 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.1% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Eastvale
| 1 | Sunrun | 464 | 384 | 82.8% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 133 | 119 | 89.5% |
| 3 | Complete Solar | 88 | 36 | 40.9% |
| 4 | SunPower | 55 | 29 | 52.7% |
| 5 | BRIGHT OPS | 30 | 28 | 93.3% |
| 6 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 23 | 18 | 78.3% |
| 7 | FREEDOM FOREVER LLC | 22 | 22 | 100.0% |
| 8 | Current Home | 14 | 13 | 92.9% |
| 9 | SOLEN ENERGY CONSTRUCTION CORPORATION | 14 | 14 | 100.0% |
| 10 | CLEAN-POWER2N | 12 | 12 | 100.0% |
| 11 | Solar Optimum Inc. | 12 | 11 | 91.7% |
| 12 | SolarMax Renewable Energy Provider, Inc | 11 | 11 | 100.0% |
| 13 | BETTER EARTH ELECTRIC INC | 10 | 9 | 90.0% |
| 14 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 9 | 9 | 100.0% |
| 15 | V3 Electric | 9 | 9 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 880 of Eastvale’s 880 installs name a module maker in the “Generator Manufacturer” fields, and most of those (555, 63.1%) used modules recorded as Qcells.
In the last 24 months, 880 of Eastvale’s 880 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (469, 53.3%) used inverters recorded as Enphase.
In the last 24 months, 696 of Eastvale’s 880 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (375, 53.9%) used batteries recorded as Tesla.
1,173 of 1,214 battery-paired PG&E and SCE installs (96.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 555 | 1,324 |
| LONGi | 113 | 275 | |
| JA Solar | 64 | 211 | |
| Tesla | 27 | 233 | |
| Silfab | 23 | not in top list | |
| Inverter maker | Enphase | 469 | 2,102 |
| Tesla | 321 | 428 | |
| SolarEdge | 103 | 1,393 | |
| Delta Electronics | 19 | 159 | |
| ABB | 15 | 200 | |
| Battery maker | Tesla | 375 | 645 |
| Enphase | 253 | 305 | |
| SolarEdge | 35 | 88 | |
| LG | 13 | 87 | |
| FranklinWH | 7 | 10 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,357 of 5,006 installs, inverters on 5,005. See the methodology and the equipment index.
ZIP codes in Eastvale
ZIP codes with their own page where the utilities recorded Eastvale on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Eastvale
The SGIP report lists 75 battery storage projects with the city Eastvale, 28 with the status Paid ($221,358 in current incentive allocations, 394 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 28 | 394 | $221,358 |
| Reserved | 14 | 9,477 | $2,930,733 |
| Pending Reservation | 5 | 84 | $90,039 |
| Waitlist | 4 | 55 | $89,158 |
| Cancelled | 18 | 2,116 | $726,100 |
| RRF Rejected | 6 | 67 | $12,012 |
Installers named on the most SGIP storage projects in Eastvale
20 of the 75 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Eastvale is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 5,006
- Last 24 months
- 880
- Capacity
- 35.1 MW DC
- Median system size
- 6.5 kW DC
- With battery storage
- 24.3% all time; 80.3% last 24 months
- Third-party owned
- 44.3% where reported
- Ownership types recorded
- PPA 1,569, lease 294, prepaid lease 12, other 117
- Median battery size
- 13.5 kWh
- Earliest install in data
- Dec 3, 2009
Common questions
How many homes in Eastvale have solar?
5,006 residential solar systems in Eastvale were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 880 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Eastvale?
81 installer names have at least one install interconnected in Eastvale in the last 24 months, and 357 appear in the full record.
How common are batteries with new solar in Eastvale?
24.3% of the solar installs interconnected in Eastvale include battery storage across all years, and 80.3% in the last 24 months (707 of 880).
How many solar installs in Eastvale are under NEM 3.0?
1,088 of the 5,006 residential solar installs in Eastvale (21.7% of the 5,006 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.