New Day Solar

How many solar installs has New Day Solar done in California, and which license number is on its installs?

New Day Solar has 2,533 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jan 3, 2012 to Aug 17, 2026), most of them in Riverside County (1,611), San Diego County (654) and San Bernardino County (131). CSLB lists license 812958 (NEW DAY SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,533
Last 24 months
347
Total capacity
23,524.2 kW DC
Median system size
8.6 kW DC
With battery storage
21.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.8% of 2,377 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
327 installs, latest Aug 17, 2026
Ownership types recorded
PPA 58, lease 3, prepaid lease 3, other 2
Median battery size
15 kWh (390 installs list a capacity)
First install
Jan 3, 2012
Latest install
Aug 17, 2026
Counties
8
Utilities
SCE 1,839, SDGE 692, PGE 2
CSLB license
812958

Is New Day Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (200 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012150
2013480
2014930
20151580
20161670
20171360
20181321
20191643
20201729
202125231
202235230
202335019
202420991
2025171116
2026 (through Aug 31, 2026)11491

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

327 of its 2,533 interconnected installs (13.0% of the 2,524 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.051620.4%not counted
NEM 2.01,68166.6%146 (11.5%)
Net Billing Tariff32713.0%245 (95.0%)
Not recorded9

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 66 of New Day Solar’s installs the utility recorded a third-party ownership type: PPA 58, lease 3, prepaid lease 3, other 2. Across all installers, 5 residential systems list a third-party owner name that matches New Day Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Goodleap LLC20
Lightreach12
Lightreach/Palmetto8
Light Reach7
New Day Solar5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 322 of New Day Solar’s 347 installs name a module maker in the “Generator Manufacturer” fields, and most of those (238, 73.9%) used modules recorded as Qcells.

In the last 24 months, 338 of New Day Solar’s 347 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (241, 71.3%) used inverters recorded as Enphase.

In the last 24 months, 239 of New Day Solar’s 347 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (125, 52.3%) used batteries recorded as Enphase.

335 of 391 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells238965
Hyundai28256
SunPower27not in top list
LG7700
Panasonic7not in top list
Inverter makerEnphase2411,534
Tesla81122
SMA9418
SolarEdge9310
SunPower698
Battery makerEnphase125206
Tesla8385
FranklinWH2837
Panasonic22
SolarEdge1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,293 of 2,533 installs, inverters on 2,519. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names New Day Solar as developer on 155 battery storage projects and as installer on 154 (154 name it as both), 155 projects in all with 3,381 kWh of storage. 93 have the status Paid, with $1,204,883 in current incentive allocations. Applications were received from Feb 26, 2018 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid931,960$1,204,883
Reserved268$56,484
Pending Reservation130$30,000
Waitlist113$47,025
Cancelled511,196$776,497
RRF Rejected7114$19,435

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency691,882$1,761,59541$1,043,543
Small Residential Storage641,052$180,90645$122,023
Large-Scale Storage11287$69,6186$32,717
Residential Solar and Storage Equity - AB 209 Non-POU228$74,4140$0
Residential Solar and Storage Equity - AB 20919$21,7570$0
Residential Storage Equity110$6,6001$6,600
Not stated7114$19,4350$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
812958NEW DAY SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorSep 24, 2002Sep 30, 20272,326

License numbers are the ones the utilities recorded on the interconnection applications (2,328 of 2,533 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 812958. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list New Day Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County8129581714182018241185135

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside1,611
San Diego654
San Bernardino131
Orange112
Los Angeles22
Kern1
Madera1
Ventura1

Top cities

CityInstalls
Murrieta450
Temecula359
San Diego218
Hemet153
Menifee114
Winchester90
Corona59
Wildomar56
Lake Elsinore47
Fallbrook43
El Cajon38
Escondido38
Riverside37
Redlands31
San Jacinto31

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NEW DAY SOLAR1,495
New Day Solar1,038

Common questions

Where does New Day Solar install solar?

Its installs are spread across 8 counties. The most are in Riverside County (1,611 installs), followed by San Diego County (654).

How often does New Day Solar install batteries with solar?

21.2% of its interconnected solar installs include battery storage across all years, and 90.8% in the last 24 months (247 of 272). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many New Day Solar installs are under NEM 3.0 (the Net Billing Tariff)?

327 of its 2,533 interconnected installs (13.0% of the 2,524 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.