Solar Optimum Inc.: latest installs on record in California

Is Solar Optimum Inc. still installing solar in California?

The most recent install credited to Solar Optimum Inc. in California’s interconnection data was approved in August 2026; it has 996 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 972228 (SOLAR OPTIMUM DESIGN & ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, expires Apr 30, 2028, the number recorded on 995 of those installs.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 31, 2026
Last 12 complete months
996 installs, September 2025 through August 2026
Last 24 months
1,772 installs
All time
10,616 installs, first approved Apr 29, 2011
License on most recent installs
972228, SOLAR OPTIMUM DESIGN & ELECTRICAL, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
Full record
Solar Optimum Inc. installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to Solar Optimum Inc.
August 202640
July 202638
June 202640
May 202653
April 202688
March 2026121
February 2026133
January 2026123
December 2025162
November 202566
October 202570
September 202562
Total996

Net Billing Tariff installs

2,209 of the installs credited to Solar Optimum Inc. (20.8% of the 10,615 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.3% of those on PG&E and SCE records include battery storage. The latest was approved Aug 31, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
201110
201230
201370
2014120
2015440
2016580
20177712
201826257
201960691
2020942205
20211,189223
20222,272358
20232,789538
2024834581
2025884724
2026 (through Aug 31, 2026)636544

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
972228SOLAR OPTIMUM DESIGN & ELECTRICALCLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical ContractorApr 30, 2028995

Names written on these installs: SOLAR OPTIMUM DESIGN & ELECTRICAL (934), Solar Optimum Inc. (61), SOLAR OPTIMUM INC (1). 995 of the 996 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to Solar Optimum Inc. approved?

The latest App Approved date on an install credited to Solar Optimum Inc. is Aug 31, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Apr 29, 2011.

How many solar installs has Solar Optimum Inc. had in California in the last 12 months?

996 residential solar installs credited to Solar Optimum Inc. were approved for interconnection from September 2025 through August 2026. Across all years it has 10,616.

Does a recent install mean Solar Optimum Inc. is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.