How many solar installs has NORTH VALLEY LLC done in California, and which license number is on its installs?

NORTH VALLEY LLC has 2,342 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Dec 27, 2012 to Jul 1, 2026), most of them in Solano County (703), Placer County (297) and Yolo County (256). CSLB lists license 1080746 (CONTINUUM) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,342
Last 24 months
829
Total capacity
17,424.7 kW DC
Median system size
6.7 kW DC
With battery storage
62.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 97.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
94.5% of 2,342 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1,472 installs, latest Jun 11, 2026
Ownership types recorded
PPA 2,165, lease 25, other 23
Median battery size
13.5 kWh (423 installs list a capacity)
First install
Dec 27, 2012
Latest install
Jul 1, 2026
Counties
35
Utilities
PGE 2,328, SCE 13, SDGE 1
CSLB license
1080746

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201300
201400
201500
201600
201700
201800
201900
202000
2021100
20223852
2023642187
2024663652
2025579565
2026 (through Aug 31, 2026)6260

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1,472 of its 2,342 interconnected installs (62.9% of the 2,342 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.1%not counted
NEM 2.086837.1%9 (1.0%)
Net Billing Tariff1,47262.9%1,456 (99.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2,213 of NORTH VALLEY LLC’s installs the utility recorded a third-party ownership type: PPA 2,165, lease 25, prepaid lease 0, other 23. Across all installers, 1 residential systems list a third-party owner name that matches NORTH VALLEY LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
EVERBRIGHT1,395
GoodLeap345
SUNRUN270
Enfin97
SUNPOWER62

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 807 of NORTH VALLEY LLC’s 829 installs name a module maker in the “Generator Manufacturer” fields, and most of those (434, 53.8%) used modules recorded as Qcells.

In the last 24 months, 829 of NORTH VALLEY LLC’s 829 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (577, 69.6%) used inverters recorded as Tesla.

In the last 24 months, 732 of NORTH VALLEY LLC’s 829 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (506, 69.1%) used batteries recorded as Tesla.

1,373 of 1,466 battery-paired PG&E and SCE installs (93.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells434638
LONGi226560
Mission Solar9696
Canadian Solar31481
JA Solar9not in top list
Inverter makerTesla577617
Enphase316995
FranklinWH84188
SolarEdge13841
SunPower1029
Battery makerTesla506545
Enphase143624
FranklinWH77179
SunPower521
SolarEdge16

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,224 of 2,342 installs, inverters on 2,342. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names NORTH VALLEY LLC as developer on 4 battery storage projects and as installer on 7 (4 name it as both), 7 projects in all with 177 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jul 28, 2023 to Mar 7, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved119$4,759
Cancelled5145$90,272
RRF Rejected113$1,740

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency266$59,6000$0
Large-Scale Storage245$9,5110$0
Residential Storage Equity126$22,4400$0
Small Residential Storage126$3,4800$0
Not stated113$1,7400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1080746CONTINUUM (Limited Liability)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorSep 3, 2021Sep 30, 20272,340

License numbers are the ones the utilities recorded on the interconnection applications (2,342 of 2,342 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1080746. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list NORTH VALLEY LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2025Total
City and County of San Francisco108074611

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Solano703
Placer297
Yolo256
San Joaquin202
Contra Costa146
Nevada112
Yuba97
El Dorado88
Sutter68
Napa56
Sonoma45
Amador36
Stanislaus33
Butte28
Colusa28
Shasta20
Calaveras19
Tehama19
Alameda15
Glenn12
Lake11
San Mateo9
Marin8
Los Angeles7
Santa Clara5
Merced4
Monterey4
Riverside4
Sacramento2
San Benito2
San Bernardino2
Fresno1
San Diego1
San Francisco1
Tuolumne1

Top cities

CityInstalls
Fairfield212
Vallejo148
Suisun City143
Vacaville135
Stockton129
Lincoln123
Woodland118
West Sacramento81
Penn Valley71
Rocklin70
Yuba City57
Dixon50
Auburn39
Plumas Lake35
American Canyon30

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NORTH VALLEY LLC2,340
North Valley1
North Valley LLC1

Common questions

Where does NORTH VALLEY LLC install solar?

Its installs are spread across 35 counties. The most are in Solano County (703 installs), followed by Placer County (297).

How often does NORTH VALLEY LLC install batteries with solar?

62.6% of its interconnected solar installs include battery storage across all years, and 97.9% in the last 24 months (811 of 828). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many NORTH VALLEY LLC installs are under NEM 3.0 (the Net Billing Tariff)?

1,472 of its 2,342 interconnected installs (62.9% of the 2,342 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.