SWSS ELECTRICAL

How many solar installs has SWSS ELECTRICAL done in California, and which license number is on its installs?

SWSS ELECTRICAL has 2,768 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 7, 2019 to Aug 27, 2026), most of them in Orange County (1,256), Santa Clara County (538) and Los Angeles County (513). CSLB lists license 1004667 (SWSS ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,768
Last 24 months
501
Total capacity
19,401.7 kW DC
Median system size
6.6 kW DC
With battery storage
12.1% all time; 36.7% last 24 months
Third-party owned
49.9% of 2,768 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
777 installs, latest Aug 27, 2026
Ownership types recorded
PPA 1,147, lease 63, other 171
Median battery size
13.5 kWh (277 installs list a capacity)
First install
Oct 7, 2019
Latest install
Aug 27, 2026
Counties
23
Utilities
SCE 2,025, PGE 743
CSLB license
1004667

Is SWSS ELECTRICAL still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (233 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019290
20201250
20215163
20226611
202365015
2024397177
202523783
2026 (through Aug 31, 2026)15355

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

777 of its 2,768 interconnected installs (28.1% of the 2,768 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01,99171.9%11 (0.6%)
Net Billing Tariff77728.1%323 (41.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1,381 of SWSS ELECTRICAL’s installs the utility recorded a third-party ownership type: PPA 1,147, lease 63, prepaid lease 0, other 171. Across all installers, 271 residential systems list a third-party owner name that matches SWSS ELECTRICAL exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova800
SWSS ELECTRICAL270
Sunnova Energy Corp213
GoodLeap, LLC71
Sunnova Energy Copr2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 499 of SWSS ELECTRICAL’s 501 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (242, 48.5%) used modules recorded as Aptos Solar.

In the last 24 months, 501 of SWSS ELECTRICAL’s 501 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (358, 71.5%) used inverters recorded as Enphase.

In the last 24 months, 183 of SWSS ELECTRICAL’s 501 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (128, 69.9%) used batteries recorded as Enphase.

332 of 334 battery-paired PG&E and SCE installs (99.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar242244
SEG Solar140976
Qcells6098
REC471,086
Hyundai9not in top list
Inverter makerEnphase3581,738
Aptos Solar9595
Tesla53160
SolarEdge2500
SunPower1229
Battery makerEnphase128174
Tesla53154
FranklinWH11
Telsa12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,575 of 2,768 installs, inverters on 2,768. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1004667SWSS ELECTRICAL (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorJun 23, 2015Jun 30, 20272,768

License numbers are the ones the utilities recorded on the interconnection applications (2,768 of 2,768 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1004667. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SWSS ELECTRICAL’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202320252026Total
City and County of San Francisco100466734020009
unincorporated San Diego County1004667474211120
unincorporated Marin County100466730000003

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange1,256
Santa Clara538
Los Angeles513
San Bernardino147
Riverside100
Alameda82
Contra Costa40
San Joaquin28
Ventura9
Solano8
Monterey7
San Francisco7
San Mateo7
Kern5
Madera5
Fresno4
Sonoma4
Napa3
Marin1
Mendocino1
Merced1
San Benito1
Shasta1

Top cities

CityInstalls
San Jose473
Garden Grove384
Westminster252
Santa Ana132
Fountain Valley99
Fullerton51
Huntington Beach49
Rosemead44
San Gabriel36
Buena Park34
Milpitas33
West Covina33
Arcadia30
Corona29
El Monte27

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SWSS ELECTRICAL2,768

Common questions

Where does SWSS ELECTRICAL install solar?

Its installs are spread across 23 counties. The most are in Orange County (1,256 installs), followed by Santa Clara County (538).

How often does SWSS ELECTRICAL install batteries with solar?

12.1% of its interconnected solar installs include battery storage across all years, and 36.7% in the last 24 months (184 of 501).

How many SWSS ELECTRICAL installs are under NEM 3.0 (the Net Billing Tariff)?

777 of its 2,768 interconnected installs (28.1% of the 2,768 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.