ECOSOLAR USA ELECTRICAL LLC

How many solar installs has ECOSOLAR USA ELECTRICAL LLC done in California, and which license number is on its installs?

ECOSOLAR USA ELECTRICAL LLC has 731 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Nov 4, 2019 to Aug 24, 2026), most of them in Orange County (617), Los Angeles County (83) and Riverside County (17). CSLB lists license 1045300 (ECOSOLAR USA ELECTRICAL LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
731
Last 24 months
228
Total capacity
4,086.9 kW DC
Median system size
4.5 kW DC
With battery storage
8.9% all time; 19.3% last 24 months
Third-party owned
3.8% of 731 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
283 installs, latest Aug 24, 2026
Ownership types recorded
PPA 5, lease 23
Median battery size
13.5 kWh (65 installs list a capacity)
First install
Nov 4, 2019
Latest install
Aug 24, 2026
Counties
6
Utilities
SCE 731
CSLB license
1045300

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019281
2020662
2021691
2022886
20231753
202410113
202512623
2026 (through Aug 31, 2026)7816

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

283 of its 731 interconnected installs (38.7% of the 731 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.044861.3%14 (3.1%)
Net Billing Tariff28338.7%51 (18.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 28 of ECOSOLAR USA ELECTRICAL LLC’s installs the utility recorded a third-party ownership type: PPA 5, lease 23, prepaid lease 0, other 0. Across all installers, 8 residential systems list a third-party owner name that matches ECOSOLAR USA ELECTRICAL LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower14
ECOSOLAR USA ELECTRICAL LLC8
AXIA by Qcells4
AIXA by Qcells1
SunPower Capital, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 226 of ECOSOLAR USA ELECTRICAL LLC’s 228 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (92, 40.7%) used modules recorded as Hyundai.

In the last 24 months, 228 of ECOSOLAR USA ELECTRICAL LLC’s 228 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (187, 82.0%) used inverters recorded as Enphase.

In the last 24 months, 42 of ECOSOLAR USA ELECTRICAL LLC’s 228 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (35, 83.3%) used batteries recorded as Tesla.

62 of 65 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai9292
SunPower36371
Silfab3383
REC2734
Qcells19101
Inverter makerEnphase187362
Tesla2943
SunPower7164
Qcells4not in top list
SolarEdge3133
Battery makerTesla3539
Enphase69
Qcells11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 720 of 731 installs, inverters on 731. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ECOSOLAR USA ELECTRICAL LLC as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 20 kWh of storage. 1 have the status Paid, with $2,289 in current incentive allocations. Applications were received from Jan 13, 2020 to Sep 22, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid111$2,289
Cancelled18$1,593

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage220$3,8811$2,289

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1045300ECOSOLAR USA ELECTRICAL LLC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorOct 8, 2018Oct 31, 2028731

License numbers are the ones the utilities recorded on the interconnection applications (731 of 731 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1045300. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ECOSOLAR USA ELECTRICAL LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020Total
unincorporated San Diego County104530011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange617
Los Angeles83
Riverside17
San Bernardino12
Kern1
Ventura1

Top cities

CityInstalls
Garden Grove252
Westminster93
Fountain Valley55
Santa Ana51
Huntington Beach49
Long Beach17
Irvine15
Stanton15
Orange14
Anaheim12
Buena Park11
Corona10
Tustin9
Fullerton7
Torrance6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ECOSOLAR USA ELECTRICAL LLC731

Common questions

Where does ECOSOLAR USA ELECTRICAL LLC install solar?

Its installs are spread across 6 counties. The most are in Orange County (617 installs), followed by Los Angeles County (83).

How often does ECOSOLAR USA ELECTRICAL LLC install batteries with solar?

8.9% of its interconnected solar installs include battery storage across all years, and 19.3% in the last 24 months (44 of 228).

How many ECOSOLAR USA ELECTRICAL LLC installs are under NEM 3.0 (the Net Billing Tariff)?

283 of its 731 interconnected installs (38.7% of the 731 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.