INFINITY SOLAR

How many solar installs has INFINITY SOLAR done in California, and which license number is on its installs?

INFINITY SOLAR has 920 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Nov 26, 2012 to Aug 28, 2026), most of them in Orange County (640), Los Angeles County (176) and Riverside County (73). CSLB lists license 824287 (INFINITY SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
920
Last 24 months
349
Total capacity
8,579.8 kW DC
Median system size
8.4 kW DC
With battery storage
51.2% all time; 92.6% last 24 months
Third-party owned
0.5% of 913 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
410 installs, latest Aug 28, 2026
Ownership types recorded
PPA 3, lease 1, prepaid lease 1
Median battery size
13.5 kWh (471 installs list a capacity)
First install
Nov 26, 2012
Latest install
Aug 28, 2026
Counties
6
Utilities
SCE 920
CSLB license
824287

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201300
201430
201540
201600
2017210
201800
201900
202000
202100
2022466
202339165
2024133100
2025166155
2026 (through Aug 31, 2026)155145

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

410 of its 920 interconnected installs (44.6% of the 920 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.080.9%not counted
NEM 2.050254.6%105 (20.9%)
Net Billing Tariff41044.6%366 (89.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of INFINITY SOLAR’s installs the utility recorded a third-party ownership type: PPA 3, lease 1, prepaid lease 1, other 0. Across all installers, 1 residential systems list a third-party owner name that matches INFINITY SOLAR exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Participate Holdings, LLC4
NRG SUNCAP LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 349 of INFINITY SOLAR’s 349 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (156, 44.7%) used modules recorded as REC.

In the last 24 months, 349 of INFINITY SOLAR’s 349 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (238, 68.2%) used inverters recorded as Tesla.

In the last 24 months, 306 of INFINITY SOLAR’s 349 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (239, 78.1%) used batteries recorded as Tesla.

451 of 471 battery-paired PG&E and SCE installs (95.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC156439
Qcells62101
Hyundai5859
Panasonic31114
Meyer Burger23120
Inverter makerTesla238267
Enphase88379
Panasonic1616
SolarEdge7187
ABB1not in top list
Battery makerTesla239311
Enphase47119
FranklinWH1819
Powerwall 322

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 912 of 920 installs, inverters on 919. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names INFINITY SOLAR as developer on 0 battery storage projects and as installer on 6 (0 name it as both), 6 projects in all with 100 kWh of storage. 5 have the status Paid, with $26,600 in current incentive allocations. Applications were received from Aug 11, 2020 to Jun 1, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid581$26,600
RRF Rejected119$2,912

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage466$11,6004$11,600
Equity Resiliency115$15,0001$15,000
Not stated119$2,9120$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
824287INFINITY SOLAR (Corporation)CLEARC-10 Electrical ContractorSep 16, 2003Sep 30, 2027920

License numbers are the ones the utilities recorded on the interconnection applications (920 of 920 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 824287. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list INFINITY SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182021Total
unincorporated San Diego County824287314

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange640
Los Angeles176
Riverside73
San Bernardino29
Santa Barbara1
Ventura1

Top cities

CityInstalls
Irvine79
Orange79
Yorba Linda60
Santa Ana49
Fullerton44
Huntington Beach40
Long Beach32
Tustin23
Corona22
Fountain Valley22
Garden Grove21
Lake Forest21
Mission Viejo21
Costa Mesa17
Brea16

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INFINITY SOLAR906
Infinity Solar14

Common questions

Where does INFINITY SOLAR install solar?

Its installs are spread across 6 counties. The most are in Orange County (640 installs), followed by Los Angeles County (176).

How often does INFINITY SOLAR install batteries with solar?

51.2% of its interconnected solar installs include battery storage across all years, and 92.6% in the last 24 months (323 of 349).

How many INFINITY SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

410 of its 920 interconnected installs (44.6% of the 920 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.