Solar installers in Lake Forest, California
Most installs here are in Orange County.
Who installs the most solar in Lake Forest?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Lake Forest are Sunrun (203), Tesla Energy Operations (formerly SolarCity) (77) and ORANGE COUNTY CONTRACTING SERVICES (37). They account for 317 of the 536 residential solar installs interconnected there in that window.
In all, 4,828 homes in Lake Forest have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 80 installers with installs in this window. 6 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | SunPower | 821 | 821 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 772 | 772 |
| 3 | Sunrun | 604 | 604 |
| 4 | Vivint Solar Developer, LLC | 306 | 306 |
| 5 | SUNNOVA ENERGY CORPORATION | 119 | 119 |
| 6 | SunStreet Energy Group LLC | 114 | 114 |
| 7 | FREEDOM FOREVER LLC | 78 | 78 |
| 8 | ORANGE COUNTY CONTRACTING SERVICES | 73 | 73 |
| 9 | Bright Planet Solar | 57 | 57 |
| 10 | Solar Optimum Inc. | 52 | 52 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 754 | 94 |
| 2023 | 875 | 104 |
| 2024 | 345 | 158 |
| 2025 | 289 | 256 |
| 2026 (through Aug 31, 2026) | 174 | 143 |
Under the Net Billing Tariff (NEM 3.0)
594 of the 4,828 residential solar installs in Lake Forest (12.3% of the 4,828 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Lake Forest
| 1 | Sunrun | 244 | 198 | 81.1% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 68 | 64 | 94.1% |
| 3 | ORANGE COUNTY CONTRACTING SERVICES | 34 | 34 | 100.0% |
| 4 | FREEDOM FOREVER LLC | 33 | 31 | 93.9% |
| 5 | CE ENERGY SERVICES INC | 11 | 11 | 100.0% |
| 6 | INFINITY SOLAR | 10 | 10 | 100.0% |
| 7 | SunPower | 10 | 9 | 90.0% |
| 8 | BRIGHT OPS | 9 | 9 | 100.0% |
| 9 | Solar Optimum Inc. | 8 | 8 | 100.0% |
| 10 | AXIA SOLAR CORP | 6 | 6 | 100.0% |
| 11 | Empower Electric Solar | 5 | 5 | 100.0% |
| 12 | NLITN energy solutions | 5 | 5 | 100.0% |
| 13 | SOLAR TECH ENERGY SYSTEMS INC | 5 | 5 | 100.0% |
| 14 | Cira Energy | 4 | 2 | 50.0% |
| 15 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 4 | 4 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 532 of Lake Forest’s 536 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (224, 42.1%) used modules recorded as Qcells.
In the last 24 months, 536 of Lake Forest’s 536 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (289, 53.9%) used inverters recorded as Tesla.
In the last 24 months, 441 of Lake Forest’s 536 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (362, 82.1%) used batteries recorded as Tesla.
856 of 897 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 224 | 904 |
| JA Solar | 58 | 203 | |
| LONGi | 57 | 214 | |
| Silfab | 56 | not in top list | |
| REC | 38 | 212 | |
| Inverter maker | Tesla | 289 | 376 |
| Enphase | 148 | 1,542 | |
| SolarEdge | 110 | 1,563 | |
| SunPower | 14 | 505 | |
| Delta Electronics | 11 | 129 | |
| Battery maker | Tesla | 362 | 596 |
| Enphase | 36 | 80 | |
| SolarEdge | 20 | 35 | |
| FranklinWH | 13 | 13 | |
| LG | 5 | 100 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,012 of 4,828 installs, inverters on 4,828. See the methodology and the equipment index.
ZIP codes in Lake Forest
ZIP codes with their own page where the utilities recorded Lake Forest on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Lake Forest
The SGIP report lists 168 battery storage projects with the city Lake Forest, 101 with the status Paid ($5,843,880 in current incentive allocations, 8,647 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 101 | 8,647 | $5,843,880 |
| Reserved | 17 | 1,571 | $569,736 |
| Pending Reservation | 3 | 40 | $64,575 |
| Cancelled | 40 | 4,659 | $2,600,909 |
| RRF Rejected | 7 | 80 | $12,564 |
Installers named on the most SGIP storage projects in Lake Forest
21 of the 168 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Lake Forest is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 4,828
- Last 24 months
- 536
- Capacity
- 30.6 MW DC
- Median system size
- 5.5 kW DC
- With battery storage
- 18.6% all time; 84.0% last 24 months
- Third-party owned
- 34.4% where reported
- Ownership types recorded
- PPA 1,142, lease 338, prepaid lease 3, other 43
- Median battery size
- 13.5 kWh
- Earliest install in data
- Apr 11, 2002
Common questions
How many homes in Lake Forest have solar?
4,828 residential solar systems in Lake Forest were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 536 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Lake Forest?
80 installer names have at least one install interconnected in Lake Forest in the last 24 months, and 439 appear in the full record.
How common are batteries with new solar in Lake Forest?
18.6% of the solar installs interconnected in Lake Forest include battery storage across all years, and 84.0% in the last 24 months (450 of 536).
How many solar installs in Lake Forest are under NEM 3.0?
594 of the 4,828 residential solar installs in Lake Forest (12.3% of the 4,828 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.