LA Solar Group

How many solar installs has LA Solar Group done in California, and which license number is on its installs?

LA Solar Group has 3,009 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Dec 15, 2012 to Jun 26, 2026), most of them in Los Angeles County (1,253), Orange County (506) and San Bernardino County (249). CSLB lists license 974115 (A P ELECTRICAL) with status Judgement Susp in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,009
Last 24 months
19
Total capacity
21,572.4 kW DC
Median system size
6.6 kW DC
With battery storage
14.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
12.2% of 2,774 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
20 installs, latest Jun 26, 2026
Ownership types recorded
PPA 84, lease 238, prepaid lease 16, other 1
Median battery size
26.4 kWh (372 installs list a capacity)
First install
Dec 15, 2012
Latest install
Jun 26, 2026
Counties
33
Utilities
SCE 2,354, SDGE 345, PGE 310
CSLB license
974115

Is LA Solar Group still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (9 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
2013310
20141790
20152520
20163930
20175301
201854055
201948988
2020386159
202116977
202266
2023101
202471
2025110
2026 (through Aug 31, 2026)50

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

20 of its 3,009 interconnected installs (0.7% of the 3,009 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,10536.7%not counted
NEM 2.01,88462.6%387 (24.1%)
Net Billing Tariff200.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 339 of LA Solar Group’s installs the utility recorded a third-party ownership type: PPA 84, lease 238, prepaid lease 16, other 1. Across all installers, 442 residential systems list a third-party owner name that matches LA Solar Group exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LASG68
LA Solar Group35
CPF33
Sunnova Energy Corporation31
Sun Edison25

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of LA Solar Group’s 19 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 94.1%) used modules recorded as LaSolarLLC.

In the last 24 months, 19 of LA Solar Group’s 19 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 73.7%) used inverters recorded as Tesla.

In the last 24 months, none of LA Solar Group’s 19 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

380 of 388 battery-paired PG&E and SCE installs (97.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLaSolarLLC16not in top list
Hyundai1not in top list
Inverter makerTesla14not in top list
Hoymiles3not in top list
Enphase21,187
SolarEdge21,419
Battery makerTesla0366
LG011
sonnen03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,695 of 3,009 installs, inverters on 3,008. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names LA Solar Group as developer on 3,654 battery storage projects and as installer on 3,628 (3,611 name it as both), 3,671 projects in all with 86,796 kWh of storage. 2,702 have the status Paid, with $41,992,332 in current incentive allocations. Applications were received from May 1, 2017 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2,70263,756$41,992,332
PBI in Process353$9,164
Reserved1612,325$1,734,044
Pending Reservation38631$1,084,334
Waitlist7105$247,275
Cancelled76019,926$12,653,454

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1,80630,115$6,110,1401,378$4,766,160
Equity Resiliency1,51046,180$45,731,8511,176$35,284,771
Large-Scale Storage2298,634$2,500,331123$1,409,505
Residential Solar and Storage Equity - AB 209 Non-POU60837$1,701,54810$251,322
Residential Solar and Storage Equity - AB 20931420$977,9422$49,672
Residential Solar and Storage Equity - Ratepayer23330$357,49110$141,564
Residential Solar and Storage Equity - AB 209 POU681$186,7193$89,336
Residential Storage Equity5172$128,1800$0
San Joaquin Valley Residential126$26,4000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
974115A P ELECTRICAL (Corporation)Judgement Susp, DISC Bond Filed| Pending Case/CIT| Judgement PendC-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJun 20, 2012Jun 30, 20282,940

License numbers are the ones the utilities recorded on the interconnection applications (2,953 of 3,009 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

CSLB’s License Master file lists a disciplinary bond on license 974115 (bond reason recorded: Conditional), required Mar 19, 2024, $50,000, CSLB case number 2021000152, bond cancelled Jun 13, 2024. CSLB lists license 974115 under the business name A P ELECTRICAL; the bond is on the license, as CSLB records it. Current CSLB record: 974115.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list LA Solar Group’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco97411511020943135065
unincorporated San Diego County9741151061255512147
unincorporated Marin County97411541721000015

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles1,253
Orange506
San Bernardino249
Ventura239
San Diego231
Riverside160
Santa Clara80
Alameda62
Contra Costa54
Kern43
Santa Barbara27
San Mateo21
Tulare10
Fresno9
Solano9
Marin8
Yolo8
San Joaquin7
San Francisco5
El Dorado4
Merced4
San Luis Obispo4
Sonoma4
Placer2
Santa Cruz2
Butte1
Kings1
Lake1
Madera1
Monterey1
Napa1
Sacramento1
Shasta1

Top cities

CityInstalls
Simi Valley78
Ladera Ranch71
Irvine66
San Diego59
Corona55
Santa Clarita49
Thousand Oaks48
Valencia48
San Jose43
Arcadia41
Lancaster40
Palmdale40
Huntington Beach37
Torrance37
Long Beach35

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LA Solar Group1,544
LA SOLAR GROUP INC1,216
LA SOLAR GROUP243
La Solar Group3
LA Solar GRoup1
LA SOlar Group1
LA Solar Group, Inc1

Common questions

Where does LA Solar Group install solar?

Its installs are spread across 33 counties. The most are in Los Angeles County (1,253 installs), followed by Orange County (506).

How often does LA Solar Group install batteries with solar?

14.6% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LA Solar Group installs are under NEM 3.0 (the Net Billing Tariff)?

20 of its 3,009 interconnected installs (0.7% of the 3,009 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.