ORANGE COUNTY CONTRACTING SERVICES
How many solar installs has ORANGE COUNTY CONTRACTING SERVICES done in California, and which license number is on its installs?
ORANGE COUNTY CONTRACTING SERVICES has 2,786 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jan 18, 2021 to Aug 28, 2026), most of them in Orange County (1,568), Los Angeles County (697) and Riverside County (221). CSLB lists license 1023627 (ORANGE COUNTY CONTRACTING SERVICES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 28, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 2,786
- Last 24 months
- 1,465
- Total capacity
- 24,343.5 kW DC
- Median system size
- 8.1 kW DC
- With battery storage
- 62.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 96.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 17.4% of 2,786 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1,429 installs, latest Aug 28, 2026
- Ownership types recorded
- PPA 482, lease 4
- Median battery size
- 13.5 kWh (1,729 installs list a capacity)
- First install
- Jan 18, 2021
- Latest install
- Aug 28, 2026
- Counties
- 11
- Utilities
- SCE 2,770, SDGE 11, PGE 5
- CSLB license
- 1023627
Is ORANGE COUNTY CONTRACTING SERVICES still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (778 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2021 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2021 | 186 | 12 |
| 2022 | 376 | 61 |
| 2023 | 596 | 135 |
| 2024 | 261 | 196 |
| 2025 | 934 | 911 |
| 2026 (through Aug 31, 2026) | 433 | 415 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1,429 of its 2,786 interconnected installs (51.3% of the 2,786 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 1,357 | 48.7% | 343 (25.5%) |
| Net Billing Tariff | 1,429 | 51.3% | 1,387 (97.1%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 486 of ORANGE COUNTY CONTRACTING SERVICES’s installs the utility recorded a third-party ownership type: PPA 482, lease 4, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ORANGE COUNTY CONTRACTING SERVICES exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Palmetto HASI Holdings LLC | 342 |
| GoodLeap LLC | 43 |
| PALMETTO LIGHTREACH | 40 |
| LightReach | 25 |
| EnFin | 19 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1,462 of ORANGE COUNTY CONTRACTING SERVICES’ 1,465 installs name a module maker in the “Generator Manufacturer” fields, and most of those (834, 57.0%) used modules recorded as Qcells.
In the last 24 months, 1,465 of ORANGE COUNTY CONTRACTING SERVICES’ 1,465 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,138, 77.7%) used inverters recorded as Tesla.
In the last 24 months, 1,373 of ORANGE COUNTY CONTRACTING SERVICES’ 1,465 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,334, 97.2%) used batteries recorded as Tesla.
1,677 of 1,730 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 834 | 897 |
| Panasonic | 250 | 1,389 | |
| REC | 79 | 88 | |
| Aptos Solar | 61 | 62 | |
| LONGi | 53 | 54 | |
| Inverter maker | Tesla | 1,138 | 1,278 |
| Enphase | 221 | 733 | |
| SolarEdge | 45 | 501 | |
| Panasonic | 32 | 32 | |
| SunPower | 17 | 163 | |
| Battery maker | Tesla | 1,334 | 1,545 |
| Enphase | 34 | 53 | |
| SolarEdge | 3 | 3 | |
| LG | 1 | 73 | |
| Panasonic | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,724 of 2,786 installs, inverters on 2,786. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names ORANGE COUNTY CONTRACTING SERVICES as developer on 267 battery storage projects and as installer on 15 (15 name it as both), 267 projects in all with 5,131 kWh of storage. 136 have the status Paid, with $556,381 in current incentive allocations. Applications were received from Jul 23, 2018 to Dec 30, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 136 | 2,810 | $556,381 |
| Reserved | 39 | 622 | $163,230 |
| Pending Reservation | 2 | 41 | $7,920 |
| Cancelled | 86 | 1,604 | $311,789 |
| RRF Rejected | 4 | 53 | $7,920 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 213 | 3,906 | $532,224 | 122 | $302,399 |
| Large-Scale Storage | 32 | 678 | $136,700 | 3 | $32,013 |
| Equity Resiliency | 17 | 479 | $343,669 | 11 | $221,969 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 1 | 15 | $26,727 | 0 | $0 |
| Not stated | 4 | 53 | $7,920 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1023627 | ORANGE COUNTY CONTRACTING SERVICES (Corporation) | CLEAR, Class Removal Pending | B General Building Contractor; C-10 Electrical Contractor | Feb 10, 2017 | Feb 28, 2027 | 2,786 |
License numbers are the ones the utilities recorded on the interconnection applications (2,786 of 2,786 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The License Master file lists a pending classification removal date of Nov 30, 2026 for license 1023627. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list ORANGE COUNTY CONTRACTING SERVICES’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|
| unincorporated San Diego County | 1023627 | 1 | 1 | 2 | 4 | 5 | 13 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Orange County Solar: 364 installs, license 1023627
- ORANGE COUNTY SOLAR CONTRACTING SERVICES INC: 233 installs, license 1023627
Counties
| County | Installs |
|---|---|
| Orange | 1,568 |
| Los Angeles | 697 |
| Riverside | 221 |
| San Bernardino | 145 |
| Ventura | 143 |
| Fresno | 3 |
| Santa Barbara | 3 |
| Kern | 2 |
| San Diego | 2 |
| Inyo | 1 |
| San Luis Obispo | 1 |
Top cities
| City | Installs |
|---|---|
| Irvine | 197 |
| Huntington Beach | 148 |
| Orange | 115 |
| Santa Ana | 113 |
| Fullerton | 81 |
| Yorba Linda | 77 |
| Mission Viejo | 75 |
| Lake Forest | 73 |
| Simi Valley | 69 |
| Long Beach | 64 |
| Corona | 63 |
| Tustin | 60 |
| Newport Beach | 50 |
| Costa Mesa | 48 |
| Rancho Santa Margarita | 45 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ORANGE COUNTY CONTRACTING SERVICES | 2,758 |
| ORANGE COUNTY CONTRACTING SERVICES INC | 28 |
Common questions
Where does ORANGE COUNTY CONTRACTING SERVICES install solar?
Its installs are spread across 11 counties. The most are in Orange County (1,568 installs), followed by Los Angeles County (697).
How often does ORANGE COUNTY CONTRACTING SERVICES install batteries with solar?
62.3% of its interconnected solar installs include battery storage across all years, and 96.2% in the last 24 months (1,409 of 1,465). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many ORANGE COUNTY CONTRACTING SERVICES installs are under NEM 3.0 (the Net Billing Tariff)?
1,429 of its 2,786 interconnected installs (51.3% of the 2,786 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.