Home solar in ZIP code 94803, California
Service city recorded on most installs: Richmond. County: Contra Costa County.
How many homes in ZIP code 94803 have solar?
PG&E, SCE and SDG&E interconnected 1,648 residential solar systems in ZIP code 94803 through Aug 31, 2026, 253 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Richmond, Contra Costa County, as the service city on 928 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 263.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 1,648
- Last 24 months
- 253 (Sep 2024 through Aug 2026)
- Capacity
- 8,759.1 kW DC
- Median system size
- 4.8 kW DC
- Net Billing Tariff (NEM 3.0)
- 312 installs, 18.9% of those with a tariff recorded
- Utility
- PGE 1,648
- First install in data
- Feb 7, 2002
- Latest install in data
- Aug 26, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2002 | 2 | 0 |
| 2003 | 5 | 0 |
| 2004 | 9 | 0 |
| 2005 | 4 | 0 |
| 2006 | 6 | 0 |
| 2007 | 8 | 0 |
| 2008 | 9 | 0 |
| 2009 | 11 | 0 |
| 2010 | 18 | 0 |
| 2011 | 10 | 0 |
| 2012 | 28 | 0 |
| 2013 | 42 | 0 |
| 2014 | 87 | 0 |
| 2015 | 97 | 0 |
| 2016 | 106 | 0 |
| 2017 | 98 | 1 |
| 2018 | 69 | 5 |
| 2019 | 76 | 7 |
| 2020 | 108 | 19 |
| 2021 | 132 | 25 |
| 2022 | 163 | 29 |
| 2023 | 229 | 52 |
| 2024 | 116 | 85 |
| 2025 | 135 | 122 |
| 2026 (through Aug 31, 2026) | 80 | 70 |
Battery storage
25.2% of the residential solar installs here include battery storage across all years (415 of 1,648). In the last 24 months the share was 88.1% (223 of 253).
Net metering tariff
Of the 1,648 installs with a net metering tariff recorded: NEM 1.0 447 (27.1%), NEM 2.0 889 (53.9%), the Net Billing Tariff (often called NEM 3.0) 312 (18.9%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
22.6% of the 1,648 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 1,275 are recorded as not third-party owned. Ownership types recorded: PPA 302, lease 59, prepaid lease 1, other 11.
Installers by installs in 94803
Installers with a page in this index, most installs in this ZIP first. 245 such installers have at least one install here. 49 more installs were by 42 installer names without a page in this index. 32 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 94803 | Last 24 months |
|---|---|---|
| Tesla Energy Operations (formerly SolarCity) | 263 | 15 |
| Sunrun | 183 | 59 |
| Kota Construction LLC | 67 | 0 |
| BRIGHT OPS | 58 | 54 |
| FREEDOM FOREVER LLC | 51 | 10 |
| SunPower | 47 | 2 |
| PetersenDean | 36 | 0 |
| Semper Solaris Construction Inc | 30 | 6 |
| High Definition Solar | 29 | 2 |
| West Coast Solar | 29 | 0 |
City and county recorded for 94803
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Richmond | 928 |
| City: El Sobrante | 720 |
| County: Contra Costa County | 1,648 |
Common questions
How common are home batteries with solar in 94803?
25.2% of the residential solar installs here include battery storage across all years (415 of 1,648). In the last 24 months the share was 88.1% (223 of 253).
How many solar installs in 94803 are under NEM 3.0?
312 of the 1,648 installs here with a tariff recorded (18.9%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 94803?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (263), Sunrun (183), Kota Construction LLC (67). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.