Solar Technologies

How many solar installs has Solar Technologies done in California, and which license number is on its installs?

Solar Technologies has 3,625 residential solar installs interconnected in California, active in the records from 2001 through 2026 (Sep 1, 2001 to Aug 31, 2026), most of them in Santa Clara County (829), Santa Cruz County (809) and Contra Costa County (770). CSLB lists license 932914 (SOLAR TECHNOLOGIES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,625
Last 24 months
467
Total capacity
22,449.9 kW DC
Median system size
5.3 kW DC
With battery storage
13.4% all time; 71.1% last 24 months
Third-party owned
0.0% of 3,625 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
344 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
14 kWh (77 installs list a capacity)
First install
Sep 1, 2001
Latest install
Aug 31, 2026
Counties
22
Utilities
PGE 3,625
CSLB license
932914

Is Solar Technologies still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (250 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2001 to 2026

YearInstalls interconnectedWith battery storage
200120
2002170
2003120
200490
200540
200650
2007450
2008460
2009960
20101010
2011520
20121010
20131320
20141710
20152080
20162170
20171410
20182100
20192134
202027717
202128431
202228442
202331023
202430277
2025261196
2026 (through Aug 31, 2026)12597

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

344 of its 3,625 interconnected installs (9.5% of the 3,625 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,25134.5%not counted
NEM 2.02,03056.0%170 (8.4%)
Net Billing Tariff3449.5%300 (87.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar Technologies’s installs. No residential system in the file lists a third-party owner name that matches Solar Technologies exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 426 of Solar Technologies’ 467 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (176, 41.3%) used modules recorded as REC.

In the last 24 months, 467 of Solar Technologies’ 467 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (266, 57.0%) used inverters recorded as Enphase.

In the last 24 months, 303 of Solar Technologies’ 467 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (164, 54.1%) used batteries recorded as Tesla.

418 of 487 battery-paired PG&E and SCE installs (85.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC176183
SunPower1432,709
Hyundai9191
Solaria13not in top list
Qcells11not in top list
Inverter makerEnphase266540
Tesla219333
SunPower832,238
SMA16496
FranklinWH8not in top list
Battery makerTesla164236
Enphase130135
FranklinWH88
SunPower148

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,417 of 3,625 installs, inverters on 3,625. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Technologies as developer on 0 battery storage projects and as installer on 304 (0 name it as both), 304 projects in all with 7,400 kWh of storage. 239 have the status Paid, with $1,392,154 in current incentive allocations. Applications were received from May 1, 2017 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2394,804$1,392,154
PBI in Process140$8,700
Reserved3657$145,261
Cancelled601,872$490,789
RRF Rejected126$3,480

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage2424,426$731,632199$599,829
Equity Resiliency37884$831,08929$679,985
Large-Scale Storage242,063$474,18211$112,340
Not stated126$3,4800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
932914SOLAR TECHNOLOGIES (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 21, 2009May 31, 20272,929

License numbers are the ones the utilities recorded on the interconnection applications (2,934 of 3,625 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 932914. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Technologies’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
City and County of San Francisco932914129107914121083
unincorporated Marin County9329144213000010

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara829
Santa Cruz809
Contra Costa770
Alameda573
San Mateo209
Monterey136
San Francisco85
Marin77
San Benito37
Solano35
San Joaquin24
Sonoma24
Napa7
Calaveras2
Kern1
Madera1
Mariposa1
Mendocino1
Placer1
Stanislaus1
Tuolumne1
Yolo1

Top cities

CityInstalls
San Jose413
Santa Cruz399
Walnut Creek159
Berkeley157
Oakland140
Aptos107
Danville98
Watsonville98
San Francisco85
San Ramon80
Lafayette71
Soquel65
Fremont63
Salinas63
Sunnyvale60

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR TECHNOLOGIES1,897
Solar Technologies1,712
solar Technologies4
Solar TEchnologies4
Solar technologies3
solar technologies2
solar TEchnologies1
SOlar Technologies1
Solar Technologies, Inc1

Common questions

Where does Solar Technologies install solar?

Its installs are spread across 22 counties. The most are in Santa Clara County (829 installs), followed by Santa Cruz County (809).

How often does Solar Technologies install batteries with solar?

13.4% of its interconnected solar installs include battery storage across all years, and 71.1% in the last 24 months (332 of 467).

How many Solar Technologies installs are under NEM 3.0 (the Net Billing Tariff)?

344 of its 3,625 interconnected installs (9.5% of the 3,625 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.