AMBROSE SOLAR

How many solar installs has AMBROSE SOLAR done in California, and which license number is on its installs?

AMBROSE SOLAR has 4,249 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Apr 26, 2017 to Aug 31, 2026), most of them in Solano County (2,423), Contra Costa County (649) and Yolo County (330). CSLB lists license 979872 (AMBROSE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
4,249
Last 24 months
846
Total capacity
35,688.8 kW DC
Median system size
7.7 kW DC
With battery storage
32.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 89.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.2% of 4,249 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
950 installs, latest Aug 31, 2026
Ownership types recorded
PPA 10
Median battery size
14 kWh (649 installs list a capacity)
First install
Apr 26, 2017
Latest install
Aug 31, 2026
Counties
27
Utilities
PGE 4,248, SDGE 1
CSLB license
979872

Is AMBROSE SOLAR still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (434 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017620
20181630
20193670
202032534
202153468
2022897121
2023806189
2024388352
2025484427
2026 (through Aug 31, 2026)223202

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

950 of its 4,249 interconnected installs (22.4% of the 4,249 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0591.4%not counted
NEM 2.03,24076.3%434 (13.4%)
Net Billing Tariff95022.4%911 (95.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of AMBROSE SOLAR’s installs the utility recorded a third-party ownership type: PPA 10, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches AMBROSE SOLAR exactly.

Third-party owner named on its installsInstalls
Sunpower5
SunRun2
Particape Energy LLC1
Participate Energy1
TEST1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 750 of AMBROSE SOLAR’s 846 installs name a module maker in the “Generator Manufacturer” fields, and most of those (565, 75.3%) used modules recorded as REC.

In the last 24 months, 846 of AMBROSE SOLAR’s 846 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (676, 79.9%) used inverters recorded as Tesla.

In the last 24 months, 616 of AMBROSE SOLAR’s 846 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (518, 84.1%) used batteries recorded as Tesla.

1,142 of 1,393 battery-paired PG&E and SCE installs (82.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC565801
SunPower1532,645
Qcells50154
Waaree11106
Canadian Solar10not in top list
Inverter makerTesla6761,174
Enphase2382,974
PointGuard Energy Inc.69not in top list
SunPower61719
SolarEdge4285
Battery makerTesla518906
PointGuard Energy Inc.6767
Enphase1016
Sigenergy1010
SunPower7147

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,742 of 4,249 installs, inverters on 4,249. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names AMBROSE SOLAR as developer on 573 battery storage projects and as installer on 571 (569 name it as both), 575 projects in all with 11,833 kWh of storage. 437 have the status Paid, with $2,410,972 in current incentive allocations. Applications were received from Jan 13, 2020 to Oct 7, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4378,961$2,410,972
Reserved16233$348,504
Pending Reservation10151$233,985
Cancelled1112,443$698,685
RRF Rejected146$4,500

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage3486,413$957,487316$877,794
Large-Scale Storage1283,219$697,77459$357,880
Equity Resiliency701,759$1,400,38160$1,141,144
Residential Solar and Storage Equity - AB 209 Non-POU23326$550,4462$34,153
Residential Solar and Storage Equity - Ratepayer341$32,9590$0
Residential Solar and Storage Equity - AB 209 POU115$37,7990$0
Residential Storage Equity115$15,3000$0
Not stated146$4,5000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
979872AMBROSE SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJan 2, 2013Nov 30, 20284,248

License numbers are the ones the utilities recorded on the interconnection applications (4,248 of 4,249 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 979872. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list AMBROSE SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222024Total
City and County of San Francisco979872000112
unincorporated Marin County979872131005

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Solano2,423
Contra Costa649
Yolo330
Napa265
Marin117
Alameda110
Placer108
Sonoma90
San Joaquin28
Sutter27
El Dorado26
Yuba18
San Mateo11
Lake7
Amador6
Santa Clara6
Calaveras5
San Francisco5
Colusa4
Nevada4
Sacramento3
Shasta2
Butte1
Glenn1
Orange1
Santa Cruz1
Tehama1

Top cities

CityInstalls
Vacaville1,405
Fairfield516
Napa188
Dixon173
Vallejo135
Davis114
Woodland86
Concord77
Winters75
Suisun City74
Benicia67
Walnut Creek65
West Sacramento58
Brentwood57
Novato50

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AMBROSE SOLAR2,569
AMBROSE CONSTRUCTION INC1,205
Ambrose Solar278
Ambrose Solar Inc.106
Ambrose Construction91

Common questions

Where does AMBROSE SOLAR install solar?

Its installs are spread across 27 counties. The most are in Solano County (2,423 installs), followed by Contra Costa County (649).

How often does AMBROSE SOLAR install batteries with solar?

32.8% of its interconnected solar installs include battery storage across all years, and 89.8% in the last 24 months (760 of 846). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many AMBROSE SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

950 of its 4,249 interconnected installs (22.4% of the 4,249 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.