SPARTAN CONSTRUCTION

How many solar installs has SPARTAN CONSTRUCTION done in California, and which license number is on its installs?

SPARTAN CONSTRUCTION has 315 residential solar installs interconnected in California, active in the records from 2021 through 2024 (Feb 17, 2021 to May 21, 2024), most of them in Los Angeles County (40), Orange County (34) and Santa Clara County (31). CSLB lists license 1021997 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
315
Last 24 months
0
Total capacity
2,389.9 kW DC
Median system size
7.1 kW DC
With battery storage
3.8% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 315 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
10.1 kWh (3 installs list a capacity)
First install
Feb 17, 2021
Latest install
May 21, 2024
Counties
35
Utilities
PGE 176, SCE 139
CSLB license
1021997

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021540
20222316
2023276
202430
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 315 interconnected installs with a tariff recorded (315) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.3%not counted
NEM 2.031499.7%12 (3.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SPARTAN CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches SPARTAN CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 264 of SPARTAN CONSTRUCTION’s 315 installs name a module maker in the “Generator Manufacturer” fields, and most of those (221, 83.7%) used modules recorded as Qcells.

Across all years, 315 of SPARTAN CONSTRUCTION’s 315 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (226, 71.7%) used inverters recorded as Enphase.

Across all years, 10 of SPARTAN CONSTRUCTION’s 315 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 100.0%) used batteries recorded as Enphase.

10 of 12 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0221
Aptos Solar020
Canadian Solar013
JinkoSolar06
LG01
Inverter makerEnphase0226
SolarEdge061
SunPower022
Tesla07
Delta Electronics01
Battery makerEnphase010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 264 of 315 installs, inverters on 315. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1021997Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical ContractorDec 22, 2016Dec 31, 2026315

License numbers are the ones the utilities recorded on the interconnection applications (315 of 315 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1021997. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SPARTAN CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022Total
City and County of San Francisco1021997011
unincorporated San Diego County1021997718

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles40
Orange34
Santa Clara31
Contra Costa28
Alameda25
San Bernardino23
Ventura16
Riverside14
Placer11
San Mateo11
Kern10
El Dorado6
Fresno5
Monterey5
San Luis Obispo5
Solano5
Tulare5
Yolo5
Marin4
Sonoma4
Lake3
Mendocino3
Nevada3
San Benito3
Santa Barbara3
Santa Cruz3
San Joaquin2
Butte1
Humboldt1
Madera1
Mono1
Sacramento1
San Francisco1
Shasta1
Tuolumne1

Top cities

CityInstalls
San Jose15
Hayward7
Oakland7
Bakersfield5
Concord5
Rocklin5
Thousand Oaks5
Fremont4
Irvine4
Rancho Santa Margarita4
San Rafael4
Whittier4
Yorba Linda4
Brea3
Brentwood3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SPARTAN CONSTRUCTION315

Common questions

Where does SPARTAN CONSTRUCTION install solar?

Its installs are spread across 35 counties. The most are in Los Angeles County (40 installs), followed by Orange County (34).

How often does SPARTAN CONSTRUCTION install batteries with solar?

3.8% of its interconnected solar installs include battery storage across all years.

How many SPARTAN CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 315 interconnected installs with a tariff recorded (315) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.