Solar Spectrum
How many solar installs has Solar Spectrum done in California, and which license number is on its installs?
Solar Spectrum has 951 residential solar installs interconnected in California, active in the records from 2017 through 2020 (May 11, 2017 to Oct 10, 2020), most of them in Alameda County (98), Contra Costa County (97) and Santa Clara County (86). The license number recorded on most of its installs, 1032817, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 951
- Last 24 months
- 0
- Total capacity
- 6,590.4 kW DC
- Median system size
- 6.4 kW DC
- With battery storage
- 2.4% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 20.8% of 951 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 184, lease 13, prepaid lease 1
- Median battery size
- 9.8 kWh (19 installs list a capacity)
- First install
- May 11, 2017
- Latest install
- Oct 10, 2020
- Counties
- 42
- Utilities
- PGE 625, SCE 326
- CSLB license
- 1032817, 909236, 103817
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 432 | 0 |
| 2018 | 242 | 1 |
| 2019 | 223 | 5 |
| 2020 | 54 | 17 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 951 interconnected installs with a tariff recorded (951) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 53 | 5.6% | not counted |
| NEM 2.0 | 898 | 94.4% | 23 (2.6%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 198 of Solar Spectrum’s installs the utility recorded a third-party ownership type: PPA 184, lease 13, prepaid lease 1, other 0. Across all installers, 101 residential systems list a third-party owner name that matches Solar Spectrum exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Solar Spectrum LLC | 83 |
| Sunnova | 57 |
| Sunrun | 39 |
| Sungevity | 15 |
| SolarSpectrum | 3 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 936 of Solar Spectrum’s 951 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (388, 41.5%) used modules recorded as Trina Solar.
Across all years, 951 of Solar Spectrum’s 951 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (911, 95.8%) used inverters recorded as SolarEdge.
Across all years, 22 of Solar Spectrum’s 951 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 100.0%) used batteries recorded as LG.
22 of 23 battery-paired PG&E and SCE installs (95.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Trina Solar | 0 | 388 |
| Qcells | 0 | 258 | |
| LG | 0 | 159 | |
| LONGi | 0 | 82 | |
| Canadian Solar | 0 | 40 | |
| Inverter maker | SolarEdge | 0 | 911 |
| Enphase | 0 | 36 | |
| ABB | 0 | 8 | |
| SMA | 0 | 5 | |
| Power-One | 0 | 4 | |
| Battery maker | LG | 0 | 22 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 936 of 951 installs, inverters on 951. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1032817 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 564 | ||||
| 909236 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 237 | ||||
| 103817 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 15 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (821 of 951 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- Sungevity, Inc.: 11,844 installs, license 1032817
- Sungevity, Inc.: 11,844 installs, license 909236
Counties
Top cities
| City | Installs |
|---|---|
| San Jose | 55 |
| Bakersfield | 23 |
| Corona | 18 |
| Fremont | 18 |
| Oakland | 16 |
| Antioch | 15 |
| Fresno | 15 |
| Livermore | 14 |
| Brentwood | 13 |
| Fontana | 13 |
| Hayward | 13 |
| Murrieta | 13 |
| Stockton | 12 |
| Tracy | 12 |
| Clovis | 9 |
Names as recorded by the utilities
The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Solar Spectrum | 542 |
| Solar Spectrum LLC | 232 |
| SOLAR SPECTRUM LLC | 120 |
| Solar Spectrum, LLC | 26 |
| Solar SPectrum | 23 |
| SOLAR SPECTRUM | 8 |
Common questions
Where does Solar Spectrum install solar?
Its installs are spread across 42 counties. The most are in Alameda County (98 installs), followed by Contra Costa County (97).
How often does Solar Spectrum install batteries with solar?
2.4% of its interconnected solar installs include battery storage across all years.
How many Solar Spectrum installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 951 interconnected installs with a tariff recorded (951) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.