How many solar installs has Fluent Solar LLC done in California, and which license number is on its installs?
Fluent Solar LLC has 754 residential solar installs interconnected in California, active in the records from 2016 through 2021 (Nov 3, 2016 to May 25, 2021), most of them in San Diego County (462), Riverside County (117) and San Bernardino County (43). The license number recorded on most of its installs, 1024791, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 754
- Last 24 months
- 0
- Total capacity
- 4,313.2 kW DC
- Median system size
- 5.2 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 66.4% of 754 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 428, prepaid lease 72, other 1
- First install
- Nov 3, 2016
- Latest install
- May 25, 2021
- Counties
- 21
- Utilities
- SDGE 484, SCE 200, PGE 70
- CSLB license
- 1024791
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2016 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2016 | 4 | 0 |
| 2017 | 156 | 0 |
| 2018 | 415 | 0 |
| 2019 | 148 | 0 |
| 2020 | 28 | 0 |
| 2021 | 3 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 754 interconnected installs with a tariff recorded (754) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 754 | 100.0% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 501 of Fluent Solar LLC’s installs the utility recorded a third-party ownership type: PPA 428, lease 0, prepaid lease 72, other 1. Across all installers, 26 residential systems list a third-party owner name that matches Fluent Solar LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sunrun | 476 |
| Fluent Solar LLC | 23 |
| BVI Solar | 2 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 724 of Fluent Solar LLC’s 754 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (221, 30.5%) used modules recorded as Hyundai.
Across all years, 754 of Fluent Solar LLC’s 754 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (384, 50.9%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Hyundai | 0 | 221 |
| Qcells | 0 | 180 | |
| SolarWorld | 0 | 100 | |
| Trina Solar | 0 | 88 | |
| Canadian Solar | 0 | 59 | |
| Inverter maker | Enphase | 0 | 384 |
| SolarEdge | 0 | 380 | |
| SMA | 0 | 5 | |
| SunPower | 0 | 2 | |
| ABB | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 724 of 754 installs, inverters on 754. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1024791 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 730 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (738 of 754 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list Fluent Solar LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2019 | Total |
|---|---|---|---|
| unincorporated San Diego County | 1024791 | 4 | 4 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| San Diego | 462 |
| Riverside | 117 |
| San Bernardino | 43 |
| Orange | 41 |
| Los Angeles | 18 |
| Lake | 16 |
| Mendocino | 14 |
| Kern | 12 |
| Fresno | 8 |
| Plumas | 5 |
| El Dorado | 3 |
| Madera | 3 |
| Placer | 2 |
| San Joaquin | 2 |
| Tulare | 2 |
| Butte | 1 |
| Glenn | 1 |
| Merced | 1 |
| Santa Clara | 1 |
| Solano | 1 |
| Yolo | 1 |
Top cities
| City | Installs |
|---|---|
| San Diego | 139 |
| Escondido | 59 |
| El Cajon | 32 |
| Oceanside | 31 |
| Chula Vista | 29 |
| San Marcos | 29 |
| Corona | 25 |
| Perris | 17 |
| Vista | 17 |
| La Mesa | 15 |
| Rancho Cucamonga | 15 |
| Carlsbad | 14 |
| San Jacinto | 14 |
| Ramona | 12 |
| Spring Valley | 12 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Fluent Solar LLC | 490 |
| FLUENT SOLAR LLC | 117 |
| Fluent Solar | 90 |
| Fluent Solar, LLC | 42 |
| FLUENT SOLAR | 15 |
Common questions
Where does Fluent Solar LLC install solar?
Its installs are spread across 21 counties. The most are in San Diego County (462 installs), followed by Riverside County (117).
How often does Fluent Solar LLC install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Fluent Solar LLC installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 754 interconnected installs with a tariff recorded (754) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.