Clean Energy Solutions
How many solar installs has Clean Energy Solutions done in California, and which license number is on its installs?
Clean Energy Solutions has 2,653 residential solar installs interconnected in California, active in the records from 2015 through 2026 (May 27, 2015 to Aug 13, 2026), most of them in Los Angeles County (622), San Bernardino County (388) and Riverside County (282). CSLB lists license 998787 (CES ROOFING) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Jan 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 2,653
- Last 24 months
- 354
- Total capacity
- 15,927.4 kW DC
- Median system size
- 5.3 kW DC
- With battery storage
- 22.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 98.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 81.8% of 2,653 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 594 installs, latest Aug 13, 2026
- Ownership types recorded
- PPA 1,993, lease 169, prepaid lease 5, other 3
- Median battery size
- 9.7 kWh (566 installs list a capacity)
- First install
- May 27, 2015
- Latest install
- Aug 13, 2026
- Counties
- 42
- Utilities
- SCE 1,679, PGE 794, SDGE 180
- CSLB license
- 998787
Is Clean Energy Solutions still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (20 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 58 | 0 |
| 2016 | 110 | 0 |
| 2017 | 94 | 0 |
| 2018 | 171 | 0 |
| 2019 | 186 | 0 |
| 2020 | 257 | 0 |
| 2021 | 376 | 0 |
| 2022 | 412 | 0 |
| 2023 | 394 | 15 |
| 2024 | 434 | 405 |
| 2025 | 155 | 145 |
| 2026 (through Aug 31, 2026) | 6 | 2 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
594 of its 2,653 interconnected installs (22.4% of the 2,653 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 197 | 7.4% | not counted |
| NEM 2.0 | 1,862 | 70.2% | 5 (0.3%) |
| Net Billing Tariff | 594 | 22.4% | 561 (98.6%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 2,170 of Clean Energy Solutions’s installs the utility recorded a third-party ownership type: PPA 1,993, lease 169, prepaid lease 5, other 3. Across all installers, 156 residential systems list a third-party owner name that matches Clean Energy Solutions exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sunrun | 1,486 |
| Everbright | 189 |
| CES CONSTRUCTION | 156 |
| Lightreach | 72 |
| Sunnova Energy Corporation | 62 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 347 of Clean Energy Solutions’ 354 installs name a module maker in the “Generator Manufacturer” fields, and most of those (192, 55.3%) used modules recorded as LONGi.
In the last 24 months, 354 of Clean Energy Solutions’ 354 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (339, 95.8%) used inverters recorded as SolarEdge.
In the last 24 months, 318 of Clean Energy Solutions’ 354 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (302, 95.0%) used batteries recorded as SolarEdge.
550 of 567 battery-paired PG&E and SCE installs (97.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | LONGi | 192 | 699 |
| Canadian Solar | 132 | 877 | |
| Qcells | 27 | 617 | |
| JA Solar | 2 | not in top list | |
| REC | 2 | not in top list | |
| Inverter maker | SolarEdge | 339 | 1,874 |
| Qcells | 8 | not in top list | |
| Enphase | 7 | 442 | |
| Tesla | 3 | not in top list | |
| Delta Electronics | 2 | not in top list | |
| Battery maker | SolarEdge | 302 | 524 |
| LG | 13 | 21 | |
| Enphase | 2 | 2 | |
| Qcells | 1 | 1 | |
| Tesla | 1 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,537 of 2,653 installs, inverters on 2,653. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 998787 | CES ROOFING (Corporation) | CLEAR | C-10 Electrical Contractor; C-39 Roofing Contractor | Nov 21, 2014 | Jan 31, 2028 | 2,612 |
License numbers are the ones the utilities recorded on the interconnection applications (2,612 of 2,653 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 998787. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Clean Energy Solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2022 | 2023 | 2024 | 2025 | Total |
|---|---|---|---|---|---|---|---|---|
| City and County of San Francisco | 998787 | 1 | 0 | 0 | 0 | 0 | 0 | 1 |
| unincorporated San Diego County | 998787 | 7 | 2 | 3 | 2 | 2 | 3 | 19 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- CES ROOFING: 204 installs, license 998787
- Clean Energy Solutions of California: 43 installs, license 998787
Counties
| County | Installs |
|---|---|
| Los Angeles | 622 |
| San Bernardino | 388 |
| Riverside | 282 |
| Kern | 238 |
| Orange | 170 |
| San Diego | 160 |
| Fresno | 133 |
| Tulare | 129 |
| San Joaquin | 81 |
| Merced | 50 |
| Ventura | 47 |
| Contra Costa | 38 |
| Kings | 33 |
| Santa Barbara | 32 |
| Monterey | 29 |
| Santa Clara | 28 |
| Solano | 23 |
| Alameda | 19 |
| Madera | 19 |
| Sonoma | 17 |
| San Luis Obispo | 14 |
| Colusa | 13 |
| Yolo | 12 |
| Lake | 10 |
| Santa Cruz | 10 |
| Tehama | 8 |
| San Mateo | 7 |
| Sutter | 7 |
| Stanislaus | 6 |
| San Benito | 5 |
| Glenn | 4 |
| Mendocino | 4 |
| Napa | 3 |
| Calaveras | 2 |
| Inyo | 2 |
| Yuba | 2 |
| Butte | 1 |
| Lassen | 1 |
| Marin | 1 |
| Mono | 1 |
| Placer | 1 |
| San Francisco | 1 |
Top cities
| City | Installs |
|---|---|
| Bakersfield | 120 |
| Palmdale | 100 |
| San Bernardino | 82 |
| Fresno | 73 |
| Lancaster | 73 |
| Fontana | 71 |
| Stockton | 61 |
| Moreno Valley | 52 |
| Santa Ana | 50 |
| Victorville | 48 |
| Hesperia | 46 |
| San Diego | 43 |
| Los Angeles | 41 |
| Compton | 35 |
| Corona | 34 |
Names as recorded by the utilities
The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| CES CONSTRUCTION | 1,148 |
| CLEAN ENERGY SOLUTIONS INC | 812 |
| Clean Energy Solutions | 441 |
| CLEAN ENERGY SOLUTIONS INC DBA CES CONSTRUCTION | 124 |
| CLEAN ENERGY SOLUTIONS | 79 |
| CLEAN-ENERGY-SOLUTIONS-INC | 32 |
| Clean Energy Solutions, Inc | 15 |
| clean Energy Solutions | 2 |
Common questions
Where does Clean Energy Solutions install solar?
Its installs are spread across 42 counties. The most are in Los Angeles County (622 installs), followed by San Bernardino County (388).
How often does Clean Energy Solutions install batteries with solar?
22.9% of its interconnected solar installs include battery storage across all years, and 98.8% in the last 24 months (333 of 337). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Clean Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?
594 of its 2,653 interconnected installs (22.4% of the 2,653 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.