How many solar installs has Akeena Solar, Inc. done in California, and which license number is on its installs?

Akeena Solar, Inc. has 1,857 residential solar installs interconnected in California, active in the records from 2002 through 2014 (Dec 13, 2002 to Feb 4, 2014), most of them in Santa Clara County (548), Fresno County (155) and San Diego County (143). The license number recorded on most of its installs, 805773, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,857
Last 24 months
0
Total capacity
8,974.7 kW DC
Median system size
4.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
5.9% of 1,654 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, lease 14, other 82
First install
Dec 13, 2002
Latest install
Feb 4, 2014
Counties
34
Utilities
PGE 1,422, SCE 262, SDGE 173
CSLB license
805773

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200220
2003100
2004570
2005740
2006870
20073290
20083820
20094930
20104120
201160
201210
201330
201410
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 1,857 interconnected installs with a tariff recorded (1,857) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,857100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 97 of Akeena Solar, Inc.’s installs the utility recorded a third-party ownership type: PPA 1, lease 14, prepaid lease 0, other 82. Across all installers, 8 residential systems list a third-party owner name that matches Akeena Solar, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunRun, Inc.46
Sun Run Inc.13
SunRun Solar Owner I, LLC10
Akeena Solar, Inc.8
SunRun Solar Partners, LLC4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1,403 of Akeena Solar, Inc.’s 1,857 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (430, 30.6%) used modules recorded as Andalay.

Across all years, 1,789 of Akeena Solar, Inc.’s 1,857 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (876, 49.0%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAndalay0430
Andalay Solar0303
Sharp0268
Kyocera0264
SunPower0120
Inverter makerSMA0876
Fronius0552
Enphase0217
SunPower082
Sharp069

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,403 of 1,857 installs, inverters on 1,789. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
805773Not found in the CSLB License Master file pulled Nov 4, 2026261

License numbers are the ones the utilities recorded on the interconnection applications (261 of 1,857 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Santa Clara548
Fresno155
San Diego143
Alameda125
San Mateo120
Orange96
Kern82
San Francisco72
Los Angeles62
Riverside58
Sonoma55
Santa Cruz53
Contra Costa49
Tulare30
San Bernardino26
Marin24
Madera23
Monterey18
San Joaquin15
Placer14
Solano12
Kings11
Napa11
Lake10
San Benito10
Merced7
Ventura7
Santa Barbara6
Colusa5
Yolo4
Tuolumne3
El Dorado1
Mendocino1
Stanislaus1

Top cities

CityInstalls
San Jose224
Los Gatos85
Bakersfield73
San Francisco72
Clovis71
San Diego68
Fresno58
Saratoga58
Livermore51
Los Altos44
Sunnyvale35
Cupertino29
Campbell28
San Juan Capo24
Fremont22

Names as recorded by the utilities

The utilities recorded this installer under 18 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Akeena Solar, Inc.726
Akeena Solar436
Akeena Solar Inc266
AKEENA SOLAR224
Akeena Solar, Inc129
AKEENA SOLAR INC45
Akeena Solar Inc.12
Akeena Solar, inc.6
Akeena Solar , Inc3
Akeena Solar, inc2
Akeena solar1
Akeena SolAr1
AKEENA SOLAR INC.1
Akeena Solar,, Inc.1
Akeena Solar,Inc.1
Akeena Solar. Inc.1
Akeena, Solar, Inc1
Akeena, Solar, inc.1

Common questions

Where does Akeena Solar, Inc. install solar?

Its installs are spread across 34 counties. The most are in Santa Clara County (548 installs), followed by Fresno County (155).

How often does Akeena Solar, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Akeena Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 1,857 interconnected installs with a tariff recorded (1,857) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.