ECLIPSE SOLAR & CONSTRUCTION has 309 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Feb 28, 2019 to May 12, 2026), most of them in Yolo County (89), Placer County (39) and Solano County (25). CSLB lists license 1049090 (ECLIPSE SOLAR & CONSTRUCTION) with status Work Comp Susp in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
309
Last 24 months
44
Total capacity
2,438.9 kW DC
Median system size
7.1 kW DC
With battery storage
14.2% all time; 70.5% last 24 months
Third-party owned
1.0% of 309 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
38 installs, latest May 12, 2026
Ownership types recorded
PPA 3
Median battery size
22.1 kWh (6 installs list a capacity)
First install
Feb 28, 2019
Latest install
May 12, 2026
Counties
27
Utilities
PGE 309
CSLB license
1049090

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019710
2020571
2021120
2022212
2023825
2024288
20252517
2026 (through Aug 31, 2026)1311

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

38 of its 309 interconnected installs (12.3% of the 309 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.2% of those include battery storage. The latest Net Billing Tariff install was approved May 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.6%not counted
NEM 2.026987.1%10 (3.7%)
Net Billing Tariff3812.3%32 (84.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of ECLIPSE SOLAR & CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ECLIPSE SOLAR & CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Enfin3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 36 of ECLIPSE SOLAR & CONSTRUCTION’s 44 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (13, 36.1%) used modules recorded as REC.

In the last 24 months, 44 of ECLIPSE SOLAR & CONSTRUCTION’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (33, 75.0%) used inverters recorded as Enphase.

In the last 24 months, 19 of ECLIPSE SOLAR & CONSTRUCTION’s 44 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (7, 36.8%) used batteries recorded as Tesla.

31 of 44 battery-paired PG&E and SCE installs (70.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1382
Qcells1098
Waaree711
SunPower664
JA Solar2not in top list
Inverter makerEnphase33150
SunPower1062
Tesla811
FranklinWH6not in top list
Qcells3not in top list
Battery makerTesla78
FranklinWH66
Enphase33
SunPower312
PointGuard Energy Inc.1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 273 of 309 installs, inverters on 309. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1049090ECLIPSE SOLAR & CONSTRUCTION (Corporation)Work Comp SuspB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJan 16, 2019Jan 31, 2027309

License numbers are the ones the utilities recorded on the interconnection applications (309 of 309 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1049090. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ECLIPSE SOLAR & CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021Total
unincorporated Marin County1049090347

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Yolo89
Placer39
Solano25
Sonoma21
Contra Costa16
Marin12
Nevada11
San Joaquin11
Santa Clara11
Sutter10
Tuolumne10
El Dorado9
Butte8
Yuba7
Calaveras5
Napa5
Alameda4
Amador3
Colusa2
Glenn2
Mariposa2
Monterey2
Kern1
Lake1
Madera1
San Mateo1
Tehama1

Top cities

CityInstalls
Woodland59
Davis14
Lincoln12
Rocklin12
Vacaville11
Santa Rosa9
Penn Valley8
Vallejo8
Yuba City8
Esparto7
Auburn6
Sonora6
Stockton6
San Jose5
West Sacramento5

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ECLIPSE SOLAR & CONSTRUCTION271
Eclipse Solar and Construction29
Eclipse Solar & Construction9

Common questions

Where does ECLIPSE SOLAR & CONSTRUCTION install solar?

Its installs are spread across 27 counties. The most are in Yolo County (89 installs), followed by Placer County (39).

How often does ECLIPSE SOLAR & CONSTRUCTION install batteries with solar?

14.2% of its interconnected solar installs include battery storage across all years, and 70.5% in the last 24 months (31 of 44).

How many ECLIPSE SOLAR & CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

38 of its 309 interconnected installs (12.3% of the 309 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.