FIVE STAR SOLAR

How many solar installs has FIVE STAR SOLAR done in California, and which license number is on its installs?

FIVE STAR SOLAR has 593 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Oct 23, 2021 to Aug 21, 2026), most of them in San Joaquin County (281), Yolo County (83) and Calaveras County (57). CSLB lists license 873535 (FIVE STAR SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
593
Last 24 months
148
Total capacity
5,125.5 kW DC
Median system size
8 kW DC
With battery storage
31.7% all time; 84.5% last 24 months
Third-party owned
0.0% of 593 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
191 installs, latest Aug 21, 2026
Ownership types recorded
none recorded
Median battery size
26.5 kWh (4 installs list a capacity)
First install
Oct 23, 2021
Latest install
Aug 21, 2026
Counties
21
Utilities
PGE 593
CSLB license
873535

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021250
20221545
202322327
20245944
20259275
2026 (through Aug 31, 2026)4037

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

191 of its 593 interconnected installs (32.2% of the 593 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.050.8%not counted
NEM 2.039766.9%17 (4.3%)
Net Billing Tariff19132.2%166 (86.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FIVE STAR SOLAR’s installs. No residential system in the file lists a third-party owner name that matches FIVE STAR SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 142 of FIVE STAR SOLAR’s 148 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (67, 47.2%) used modules recorded as Qcells.

In the last 24 months, 148 of FIVE STAR SOLAR’s 148 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (82, 55.4%) used inverters recorded as Enphase.

In the last 24 months, 108 of FIVE STAR SOLAR’s 148 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (57, 52.8%) used batteries recorded as Enphase.

165 of 188 battery-paired PG&E and SCE installs (87.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells6794
REC3955
JA Solar1717
SEG Solar88
Panasonic7376
Inverter makerEnphase82525
Tesla7373
FranklinWH511
SolarEdge37
SunPower36
Battery makerEnphase57108
Tesla4646
FranklinWH511
SunPower11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 566 of 593 installs, inverters on 593. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names FIVE STAR SOLAR as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 14 kWh of storage. 1 have the status Paid, with $2,142 in current incentive allocations. Applications were received from Nov 5, 2025 to Nov 5, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid114$2,142

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage114$2,1421$2,142

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
873535FIVE STAR SOLAR (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorFeb 28, 2006May 31, 2028593

License numbers are the ones the utilities recorded on the interconnection applications (593 of 593 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 873535. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin281
Yolo83
Calaveras57
Sutter38
Stanislaus23
Alameda19
Placer18
Contra Costa16
Butte11
El Dorado11
Yuba11
Santa Clara6
Sacramento3
Solano3
Tuolumne3
Amador2
Marin2
Merced2
Nevada2
San Mateo1
Shasta1

Top cities

CityInstalls
Stockton115
Manteca63
Tracy62
Yuba City30
Woodland29
Davis26
West Sacramento24
Oakdale21
Valley Springs15
Livermore12
Copperopolis11
Rocklin9
Lathrop8
Oroville8
Acampo7

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FIVE STAR SOLAR593

Common questions

Where does FIVE STAR SOLAR install solar?

Its installs are spread across 21 counties. The most are in San Joaquin County (281 installs), followed by Yolo County (83).

How often does FIVE STAR SOLAR install batteries with solar?

31.7% of its interconnected solar installs include battery storage across all years, and 84.5% in the last 24 months (125 of 148).

How many FIVE STAR SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

191 of its 593 interconnected installs (32.2% of the 593 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.