Sunriver Solar

How many solar installs has Sunriver Solar done in California, and which license number is on its installs?

Sunriver Solar has 220 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jul 20, 2016 to Aug 21, 2026), most of them in Placer County (90), Nevada County (38) and El Dorado County (21). CSLB lists license 970886 (SUNRIVER SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
220
Last 24 months
192
Total capacity
1,875.3 kW DC
Median system size
8.2 kW DC
With battery storage
77.3% all time; 88.5% last 24 months
Third-party owned
13.6% of 220 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
162 installs, latest Aug 21, 2026
Ownership types recorded
PPA 30
Median battery size
14 kWh (123 installs list a capacity)
First install
Jul 20, 2016
Latest install
Aug 21, 2026
Counties
14
Utilities
PGE 220
CSLB license
970886

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201620
201710
2018100
2019130
202010
202100
202200
202300
202410
2025136121
2026 (through Aug 31, 2026)5649

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

162 of its 220 interconnected installs (73.6% of the 220 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0125.5%not counted
NEM 2.04620.9%11 (23.9%)
Net Billing Tariff16273.6%152 (93.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 30 of Sunriver Solar’s installs the utility recorded a third-party ownership type: PPA 30, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Sunriver Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Goodleap14
Concert/Propel10
LightReach4
Solsource1
Sunriver Solar1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 178 of Sunriver Solar’s 192 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (77, 43.3%) used modules recorded as REC.

In the last 24 months, 192 of Sunriver Solar’s 192 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (130, 67.7%) used inverters recorded as Tesla.

In the last 24 months, 110 of Sunriver Solar’s 192 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (72, 65.5%) used batteries recorded as Tesla.

109 of 170 battery-paired PG&E and SCE installs (64.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC7777
Qcells3861
JA Solar3232
LONGi1515
Silfab1212
Inverter makerTesla130130
Enphase5455
PointGuard Energy Inc.99
SunPower7not in top list
SMA68
Battery makerTesla7272
Enphase2626
PointGuard Energy Inc.88
FranklinWH22
Sigenergy22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 206 of 220 installs, inverters on 220. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sunriver Solar as developer on 0 battery storage projects and as installer on 6 (0 name it as both), 6 projects in all with 93 kWh of storage. 4 have the status Paid, with $47,362 in current incentive allocations. Applications were received from Aug 25, 2020 to Dec 19, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid456$47,362
Reserved124$3,569
Cancelled113$13,200

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency459$59,1063$45,906
Small Residential Storage234$5,0251$1,456

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970886SUNRIVER SOLAR INC (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorMar 14, 2012Mar 31, 2028219

License numbers are the ones the utilities recorded on the interconnection applications (220 of 220 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970886. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer90
Nevada38
El Dorado21
Yolo19
Yuba12
Solano9
Contra Costa7
Marin6
Napa6
Sutter6
Amador3
Alameda1
Butte1
San Joaquin1

Top cities

CityInstalls
Auburn38
Grass Valley19
Lincoln15
Davis9
Rocklin9
Foresthill8
Granite Bay8
El Dorado Hills7
Penn Valley6
Yuba City6
Napa5
Nevada City5
Vacaville5
Colfax4
Marysville4

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNRIVER SOLAR INC190
Sunriver Solar29
Sunriver Solar, INC1

Common questions

Where does Sunriver Solar install solar?

Its installs are spread across 14 counties. The most are in Placer County (90 installs), followed by Nevada County (38).

How often does Sunriver Solar install batteries with solar?

77.3% of its interconnected solar installs include battery storage across all years, and 88.5% in the last 24 months (170 of 192).

How many Sunriver Solar installs are under NEM 3.0 (the Net Billing Tariff)?

162 of its 220 interconnected installs (73.6% of the 220 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.