Home solar in ZIP code 94590, California
Service city recorded on most installs: Vallejo. County: Solano County.
How many homes in ZIP code 94590 have solar?
PG&E, SCE and SDG&E interconnected 1,079 residential solar systems in ZIP code 94590 through Aug 31, 2026, 195 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Vallejo, Solano County, as the service city on 1,079 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 124.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 1,079
- Last 24 months
- 195 (Sep 2024 through Aug 2026)
- Capacity
- 5,345.7 kW DC
- Median system size
- 4.5 kW DC
- Net Billing Tariff (NEM 3.0)
- 249 installs, 23.1% of those with a tariff recorded
- Utility
- PGE 1,079
- First install in data
- Aug 11, 1999
- Latest install in data
- Aug 19, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 1999 | 1 | 0 |
| 2000 | 0 | 0 |
| 2001 | 0 | 0 |
| 2002 | 1 | 0 |
| 2003 | 2 | 0 |
| 2004 | 2 | 0 |
| 2005 | 1 | 0 |
| 2006 | 2 | 0 |
| 2007 | 3 | 0 |
| 2008 | 3 | 0 |
| 2009 | 2 | 0 |
| 2010 | 8 | 0 |
| 2011 | 5 | 0 |
| 2012 | 4 | 0 |
| 2013 | 14 | 0 |
| 2014 | 26 | 0 |
| 2015 | 61 | 0 |
| 2016 | 86 | 0 |
| 2017 | 61 | 0 |
| 2018 | 73 | 0 |
| 2019 | 53 | 3 |
| 2020 | 84 | 4 |
| 2021 | 70 | 7 |
| 2022 | 134 | 17 |
| 2023 | 131 | 30 |
| 2024 | 93 | 74 |
| 2025 | 112 | 104 |
| 2026 (through Aug 31, 2026) | 47 | 41 |
Battery storage
25.9% of the residential solar installs here include battery storage across all years (280 of 1,079). In the last 24 months the share was 90.8% (177 of 195).
Net metering tariff
Of the 1,079 installs with a net metering tariff recorded: NEM 1.0 223 (20.7%), NEM 2.0 607 (56.3%), the Net Billing Tariff (often called NEM 3.0) 249 (23.1%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
34.9% of the 1,079 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 702 are recorded as not third-party owned. Ownership types recorded: PPA 303, lease 54, prepaid lease 1, other 19.
Installers by installs in 94590
Installers with a page in this index, most installs in this ZIP first. 184 such installers have at least one install here. 17 more installs were by 17 installer names without a page in this index. 20 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 94590 | Last 24 months |
|---|---|---|
| Tesla Energy Operations (formerly SolarCity) | 124 | 4 |
| Sunrun | 115 | 41 |
| BRIGHT OPS | 61 | 54 |
| V3 Electric | 41 | 3 |
| FREEDOM FOREVER LLC | 40 | 2 |
| AMBROSE SOLAR | 33 | 11 |
| BETTER EARTH ELECTRIC INC | 31 | 3 |
| SunPower | 28 | 0 |
| Bright Planet Solar | 25 | 1 |
| Vivint Solar Developer, LLC | 24 | 0 |
City and county recorded for 94590
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Vallejo | 1,079 |
| County: Solano County | 1,079 |
Common questions
How common are home batteries with solar in 94590?
25.9% of the residential solar installs here include battery storage across all years (280 of 1,079). In the last 24 months the share was 90.8% (177 of 195).
How many solar installs in 94590 are under NEM 3.0?
249 of the 1,079 installs here with a tariff recorded (23.1%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 94590?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (124), Sunrun (115), BRIGHT OPS (61). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.