Home solar in ZIP code 95220, California
Service city recorded on most installs: Acampo. County: San Joaquin County.
How many homes in ZIP code 95220 have solar?
PG&E, SCE and SDG&E interconnected 864 residential solar systems in ZIP code 95220 through Aug 31, 2026, 90 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Acampo, San Joaquin County, as the service city on 863 of them. Sunrun has the most installs recorded in this ZIP, 68.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 864
- Last 24 months
- 90 (Sep 2024 through Aug 2026)
- Capacity
- 8,779.4 kW DC
- Median system size
- 8.8 kW DC
- Net Billing Tariff (NEM 3.0)
- 98 installs, 11.3% of those with a tariff recorded
- Utility
- PGE 864
- First install in data
- Jul 25, 2001
- Latest install in data
- Aug 27, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2001 | 1 | 0 |
| 2002 | 0 | 0 |
| 2003 | 2 | 0 |
| 2004 | 2 | 0 |
| 2005 | 3 | 0 |
| 2006 | 4 | 0 |
| 2007 | 3 | 0 |
| 2008 | 4 | 0 |
| 2009 | 9 | 0 |
| 2010 | 12 | 0 |
| 2011 | 17 | 0 |
| 2012 | 12 | 0 |
| 2013 | 14 | 0 |
| 2014 | 52 | 0 |
| 2015 | 63 | 0 |
| 2016 | 73 | 0 |
| 2017 | 59 | 1 |
| 2018 | 49 | 0 |
| 2019 | 49 | 1 |
| 2020 | 47 | 2 |
| 2021 | 61 | 5 |
| 2022 | 90 | 3 |
| 2023 | 106 | 6 |
| 2024 | 52 | 33 |
| 2025 | 49 | 37 |
| 2026 (through Aug 31, 2026) | 31 | 19 |
Battery storage
12.4% of the residential solar installs here include battery storage across all years (107 of 864). In the last 24 months the share was 70.0% (63 of 90).
Net metering tariff
Of the 864 installs with a net metering tariff recorded: NEM 1.0 276 (31.9%), NEM 2.0 490 (56.7%), the Net Billing Tariff (often called NEM 3.0) 98 (11.3%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
19.7% of the 864 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 694 are recorded as not third-party owned. Ownership types recorded: PPA 139, lease 30, other 1.
Installers by installs in 95220
Installers with a page in this index, most installs in this ZIP first. 177 such installers have at least one install here. 66 more installs were by 49 installer names without a page in this index. 54 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 95220 | Last 24 months |
|---|---|---|
| Sunrun | 68 | 17 |
| Tesla Energy Operations (formerly SolarCity) | 50 | 2 |
| Infinity Energy, Inc | 41 | 0 |
| V3 Electric | 34 | 6 |
| Fusion Power Design | 29 | 6 |
| Vivint Solar Developer, LLC | 25 | 0 |
| The Solar Company | 20 | 0 |
| Sunkiss Solar | 17 | 0 |
| AMPWRX | 12 | 1 |
| Renewable Technologies, Inc. | 12 | 0 |
City and county recorded for 95220
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Acampo | 863 |
| County: San Joaquin County | 864 |
1 other city value on 1 install, each under 1% of this ZIP’s installs, are not listed.
Common questions
How common are home batteries with solar in 95220?
12.4% of the residential solar installs here include battery storage across all years (107 of 864). In the last 24 months the share was 70.0% (63 of 90).
How many solar installs in 95220 are under NEM 3.0?
98 of the 864 installs here with a tariff recorded (11.3%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 95220?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (68), Tesla Energy Operations (formerly SolarCity) (50), Infinity Energy, Inc (41). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.