AM SUN SOLAR

How many solar installs has AM SUN SOLAR done in California, and which license number is on its installs?

AM SUN SOLAR has 511 residential solar installs interconnected in California, active in the records from 2009 through 2020 (Jul 16, 2009 to Aug 19, 2020), most of them in San Luis Obispo County (457), Santa Barbara County (31) and Fresno County (9). CSLB lists license 969522 (A.M. SUN SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
511
Last 24 months
0
Total capacity
3,210.8 kW DC
Median system size
5.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
1.4% of 510 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 7
First install
Jul 16, 2009
Latest install
Aug 19, 2020
Counties
10
Utilities
PGE 508, SCE 2, SDGE 1
CSLB license
969522

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201010
201100
201260
2013120
201400
201500
201620
201720
20182050
20192750
202070
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 511 interconnected installs with a tariff recorded (511) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0224.3%not counted
NEM 2.048995.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 7 of AM SUN SOLAR’s installs the utility recorded a third-party ownership type: PPA 7, lease 0, prepaid lease 0, other 0. Across all installers, 4 residential systems list a third-party owner name that matches AM SUN SOLAR exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Spruce4
AM Sun Solar1
Grid Tech1
LifeStyle1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 509 of AM SUN SOLAR’s 511 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (211, 41.5%) used modules recorded as Qcells.

Across all years, 511 of AM SUN SOLAR’s 511 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (381, 74.6%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0211
Mission Solar070
SolarWorld044
Heliene041
Canadian Solar030
Inverter makerSolarEdge0381
Enphase092
SMA014
Fronius013
APsystems (Altenergy Power System)010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 509 of 511 installs, inverters on 511. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names AM SUN SOLAR as developer on 0 battery storage projects and as installer on 334 (0 name it as both), 334 projects in all with 9,730 kWh of storage. 260 have the status Paid, with $7,191,818 in current incentive allocations. Applications were received from Feb 20, 2020 to May 16, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2607,476$7,191,818
Cancelled742,254$2,264,924

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency3219,484$9,417,043247$7,152,119
Small Residential Storage13246$39,69913$39,699

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
969522A.M. SUN SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorJan 25, 2012Jan 31, 2028493

License numbers are the ones the utilities recorded on the interconnection applications (493 of 511 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 969522. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Luis Obispo457
Santa Barbara31
Fresno9
Monterey8
Los Angeles1
San Bernardino1
San Diego1
Santa Clara1
Stanislaus1
Tulare1

Top cities

CityInstalls
Paso Robles223
Atascadero62
Templeton44
Arroyo Grande25
San Miguel22
Santa Maria18
San Luis Obispo15
Nipomo13
Pismo Beach12
Creston10
Los Osos6
Solvang6
Grover Beach5
Morro Bay5
Cambria4

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AM SUN SOLAR474
AM Sun Solar36
am sun solar1

Common questions

Where does AM SUN SOLAR install solar?

Its installs are spread across 10 counties. The most are in San Luis Obispo County (457 installs), followed by Santa Barbara County (31).

How often does AM SUN SOLAR install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many AM SUN SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 511 interconnected installs with a tariff recorded (511) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.