Trinity Power has 538 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Sep 6, 2016 to Aug 31, 2026), most of them in Fresno County (360), Madera County (96) and Tulare County (27). CSLB lists license 853740 (TRINITY POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
538
Last 24 months
68
Total capacity
4,557.2 kW DC
Median system size
7.9 kW DC
With battery storage
2.2% all time; 11.8% last 24 months
Third-party owned
5.9% of 538 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
47 installs, latest Aug 31, 2026
Ownership types recorded
PPA 10, lease 20, other 2
Median battery size
12 kWh (7 installs list a capacity)
First install
Sep 6, 2016
Latest install
Aug 31, 2026
Counties
13
Utilities
PGE 513, SCE 25
CSLB license
853740

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201640
2017410
2018860
2019991
2020430
2021550
2022671
2023601
2024241
2025476
2026 (through Aug 31, 2026)122

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

47 of its 538 interconnected installs (8.7% of the 538 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 17.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.081.5%not counted
NEM 2.048389.8%3 (0.6%)
Net Billing Tariff478.7%8 (17.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 32 of Trinity Power’s installs the utility recorded a third-party ownership type: PPA 10, lease 20, prepaid lease 0, other 2. Across all installers, 3 residential systems list a third-party owner name that matches Trinity Power exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Lifestyle Energy Financial11
Kilowatt Financial, LLC6
SunPower5
Lifestyle Energy3
SunPower Capital3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 67 of Trinity Power’s 68 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 31.3%) used modules recorded as Znshine.

In the last 24 months, 68 of Trinity Power’s 68 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (60, 88.2%) used inverters recorded as Enphase.

In the last 24 months, 7 of Trinity Power’s 68 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 71.4%) used batteries recorded as Tesla.

9 of 12 battery-paired PG&E and SCE installs (75.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine2121
Phono Solar Technology10not in top list
Hyundai830
Qcells8120
Axitec5not in top list
Inverter makerEnphase60309
Tesla68
SunPower362
Power-One2not in top list
Fronius1not in top list
Battery makerTesla55
Enphase11
SunPower13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 515 of 538 installs, inverters on 538. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Trinity Power as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 58 kWh of storage. 1 have the status Paid, with $3,831 in current incentive allocations. Applications were received from Nov 26, 2019 to Dec 29, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid117$3,831
Cancelled141$31,500

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Non-Residential Storage Equity141$31,5000$0
Small Residential Storage117$3,8311$3,831

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
853740TRINITY POWER (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJan 27, 2005Mar 31, 2027536

License numbers are the ones the utilities recorded on the interconnection applications (538 of 538 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 853740. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Fresno360
Madera96
Tulare27
Merced19
Kings15
Mariposa7
San Joaquin5
Tuolumne3
Stanislaus2
Alameda1
El Dorado1
Solano1
Sutter1

Top cities

CityInstalls
Fresno190
Clovis96
Madera71
Sanger16
Selma15
Coarsegold12
Merced11
Coalinga9
Visalia9
Chowchilla8
Kingsburg8
Lemoore8
Reedley8
Kerman7
Atwater6

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TRINITY POWER295
Trinity Power242
Trinity power1

Common questions

Where does Trinity Power install solar?

Its installs are spread across 13 counties. The most are in Fresno County (360 installs), followed by Madera County (96).

How often does Trinity Power install batteries with solar?

2.2% of its interconnected solar installs include battery storage across all years, and 11.8% in the last 24 months (8 of 68).

How many Trinity Power installs are under NEM 3.0 (the Net Billing Tariff)?

47 of its 538 interconnected installs (8.7% of the 538 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 17.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.