COOL ELECTRIC

How many solar installs has COOL ELECTRIC done in California, and which license number is on its installs?

COOL ELECTRIC has 38 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Oct 6, 2022 to Aug 12, 2026), most of them in El Dorado County (34), Placer County (3) and San Mateo County (1). CSLB lists license 1023016 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
38
Last 24 months
26
Total capacity
230.5 kW DC
Median system size
6.5 kW DC
With battery storage
63.2% all time; 88.5% last 24 months
Third-party owned
0.0% of 38 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Aug 12, 2026
Ownership types recorded
none recorded
Median battery size
20 kWh (21 installs list a capacity)
First install
Oct 6, 2022
Latest install
Aug 12, 2026
Counties
3
Utilities
PGE 38
CSLB license
1023016

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202230
202370
202475
202576
2026 (through Aug 31, 2026)1413

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 38 interconnected installs (55.3% of the 38 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.025.3%not counted
NEM 2.01539.5%5 (33.3%)
Net Billing Tariff2155.3%17 (81.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on COOL ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches COOL ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 23 of COOL ELECTRIC’s 26 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 34.8%) used modules recorded as Qcells.

In the last 24 months, 26 of COOL ELECTRIC’s 26 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (15, 57.7%) used inverters recorded as Tesla.

In the last 24 months, 9 of COOL ELECTRIC’s 26 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 77.8%) used batteries recorded as Tesla.

9 of 24 battery-paired PG&E and SCE installs (37.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells89
LONGi66
Silfab312
FNS Power Technology Inc22
EG411
Inverter makerTesla1515
Enphase1123
Shenzhen Lux Power Technology Co., Ltd.45
SolarEdge22
EG411
Battery makerTesla77
Enphase22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 33 of 38 installs, inverters on 38. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names COOL ELECTRIC as developer on 23 battery storage projects and as installer on 37 (22 name it as both), 38 projects in all with 1,111 kWh of storage. 19 have the status Paid, with $543,734 in current incentive allocations. Applications were received from Aug 7, 2023 to Jan 13, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid19596$543,734
Reserved6132$200,876
Pending Reservation598$176,545
Cancelled8285$255,462

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency21722$708,09316$524,984
Residential Solar and Storage Equity - AB 209 Non-POU11267$426,9260$0
Small Residential Storage495$12,5582$4,230
Residential Solar and Storage Equity - Ratepayer226$29,0401$14,520

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1023016Sole owner license (name not shown)CLEARC-10 Electrical ContractorJan 26, 2017Jan 31, 202738

License numbers are the ones the utilities recorded on the interconnection applications (38 of 38 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1023016. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado34
Placer3
San Mateo1

Top cities

CityInstalls
Cool16
Pilot Hill6
Garden Valley4
Georgetown3
Colfax1
Greenwood1
Lincoln1
Loomis1
Millbrae1
Placerville1
Shingle Springs1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
COOL ELECTRIC38

Common questions

Where does COOL ELECTRIC install solar?

Its installs are spread across 3 counties. The most are in El Dorado County (34 installs), followed by Placer County (3).

How often does COOL ELECTRIC install batteries with solar?

63.2% of its interconnected solar installs include battery storage across all years, and 88.5% in the last 24 months (23 of 26).

How many COOL ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 38 interconnected installs (55.3% of the 38 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.