Home solar in ZIP code 95651, California

Service city recorded on most installs: Lotus. County: El Dorado County.

How many homes in ZIP code 95651 have solar?

PG&E, SCE and SDG&E interconnected 88 residential solar systems in ZIP code 95651 through Aug 31, 2026, 13 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Lotus, El Dorado County, as the service city on 86 of them. Sierra Energy Savers has the most installs recorded in this ZIP, 9.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
88
Last 24 months
13 (Sep 2024 through Aug 2026)
Capacity
679.3 kW DC
Median system size
7.4 kW DC
Net Billing Tariff (NEM 3.0)
12 installs, 13.6% of those with a tariff recorded
Utility
PGE 88
First install in data
Jul 14, 2001
Latest install in data
Jul 31, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200110
200200
200310
200400
200500
200600
200700
200810
200900
201000
201130
201200
201320
201400
201540
201680
201740
201830
201960
202082
2021114
2022113
202370
202485
202531
2026 (through Aug 31, 2026)75

Battery storage

22.7% of the residential solar installs here include battery storage across all years (20 of 88). In the last 24 months the share was 69.2% (9 of 13).

Net metering tariff

Of the 88 installs with a net metering tariff recorded: NEM 1.0 20 (22.7%), NEM 2.0 56 (63.6%), the Net Billing Tariff (often called NEM 3.0) 12 (13.6%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

13.6% of the 88 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 76 are recorded as not third-party owned. Ownership types recorded: PPA 9, lease 2, other 1.

Installers by installs in 95651

Installers with a page in this index, most installs in this ZIP first. 34 such installers have at least one install here. 11 more installs were by 8 installer names without a page in this index. 12 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95651Last 24 months
Sierra Energy Savers90
V3 Electric84
Tesla Energy Operations (formerly SolarCity)50
Capital Aire Systems30
EXCITE ENERGY30
Hooked On Solar30
Apex Solar, Inc.20
Findleton Electric20
GREEN DAY POWER20
HESS ENERGY AND SUSTAINABLE SOLUTIONS LLC20

City and county recorded for 95651

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Lotus86
City: Coloma1
City: Garden Valley1
County: El Dorado County88

Common questions

How common are home batteries with solar in 95651?

22.7% of the residential solar installs here include battery storage across all years (20 of 88). In the last 24 months the share was 69.2% (9 of 13).

How many solar installs in 95651 are under NEM 3.0?

12 of the 88 installs here with a tariff recorded (13.6%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95651?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sierra Energy Savers (9), V3 Electric (8), Tesla Energy Operations (formerly SolarCity) (5). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.