Apex Solar, Inc.

How many solar installs has Apex Solar, Inc. done in California, and which license number is on its installs?

Apex Solar, Inc. has 537 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Dec 8, 2006 to Jun 30, 2026), most of them in El Dorado County (422), Placer County (96) and Santa Clara County (6). CSLB lists license 885660 (APEX SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
537
Last 24 months
35
Total capacity
4,566.2 kW DC
Median system size
7.5 kW DC
With battery storage
10.6% all time; 80.0% last 24 months
Third-party owned
0.0% of 537 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Jan 6, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (47 installs list a capacity)
First install
Dec 8, 2006
Latest install
Jun 30, 2026
Counties
13
Utilities
PGE 537
CSLB license
885660

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200610
200770
2008130
2009260
2010270
2011380
2012180
2013320
2014400
2015370
2016570
2017340
2018300
2019370
2020203
2021173
2022178
2023408
20241712
20252319
2026 (through Aug 31, 2026)64

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 537 interconnected installs (3.9% of the 537 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.030757.2%not counted
NEM 2.020938.9%25 (12.0%)
Net Billing Tariff213.9%21 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Apex Solar, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Apex Solar, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 23 of Apex Solar, Inc.’s 35 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 39.1%) used modules recorded as Qcells.

In the last 24 months, 35 of Apex Solar, Inc.’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (25, 71.4%) used inverters recorded as Tesla.

In the last 24 months, 16 of Apex Solar, Inc.’s 35 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (16, 100.0%) used batteries recorded as Tesla.

29 of 57 battery-paired PG&E and SCE installs (50.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells923
LONGi5not in top list
REC525
SunPower3172
LG2150
Inverter makerTesla2529
SolarEdge14368
Enphase219
SMA267
SunPower271
Battery makerTesla1618

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 472 of 537 installs, inverters on 537. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Apex Solar, Inc. as developer on 8 battery storage projects and as installer on 8 (8 name it as both), 8 projects in all with 223 kWh of storage. 8 have the status Paid, with $222,082 in current incentive allocations. Applications were received from Sep 9, 2020 to Sep 2, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8223$222,082

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency8223$222,0828$222,082

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
885660APEX SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorOct 12, 2006Nov 30, 2026372

License numbers are the ones the utilities recorded on the interconnection applications (376 of 537 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 885660. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado422
Placer96
Santa Clara6
Amador2
Monterey2
Yolo2
Alameda1
Calaveras1
Contra Costa1
Nevada1
San Joaquin1
Santa Cruz1
Shasta1

Top cities

CityInstalls
El Dorado Hills322
Granite Bay46
Shingle Springs30
Rocklin27
Placerville25
Cameron Park23
Auburn10
Rescue10
San Jose5
Newcastle4
El Dorado3
Roseville3
Cool2
Davis2
Lincoln2

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Apex Solar, Inc.257
APEX SOLAR INC147
Apex Solar66
Apex Solar, Inc40
Apex Solar Inc18
Apex Solar Inc.7
Apex Solar, inc1
Apex Solar, iNC.1

Common questions

Where does Apex Solar, Inc. install solar?

Its installs are spread across 13 counties. The most are in El Dorado County (422 installs), followed by Placer County (96).

How often does Apex Solar, Inc. install batteries with solar?

10.6% of its interconnected solar installs include battery storage across all years, and 80.0% in the last 24 months (28 of 35).

How many Apex Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 537 interconnected installs (3.9% of the 537 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.