EXCITE ENERGY

How many solar installs has EXCITE ENERGY done in California, and which license number is on its installs?

EXCITE ENERGY has 397 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Nov 18, 2020 to Apr 1, 2026), most of them in El Dorado County (255), Placer County (83) and Yolo County (14). CSLB lists license 1018541 (EXCITE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
397
Last 24 months
39
Total capacity
3,687.1 kW DC
Median system size
8.8 kW DC
With battery storage
27.2% all time; 84.6% last 24 months
Third-party owned
0.0% of 397 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
29 installs, latest Mar 9, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (87 installs list a capacity)
First install
Nov 18, 2020
Latest install
Apr 1, 2026
Counties
19
Utilities
PGE 397
CSLB license
1018541

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020110
20218622
20229617
202313821
20244429
20251816
2026 (through Aug 31, 2026)43

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

29 of its 397 interconnected installs (7.3% of the 397 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.051.3%not counted
NEM 2.036391.4%74 (20.4%)
Net Billing Tariff297.3%29 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on EXCITE ENERGY’s installs. No residential system in the file lists a third-party owner name that matches EXCITE ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 29 of EXCITE ENERGY’s 39 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 48.3%) used modules recorded as Qcells.

In the last 24 months, 39 of EXCITE ENERGY’s 39 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 74.4%) used inverters recorded as Tesla.

In the last 24 months, 24 of EXCITE ENERGY’s 39 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 91.7%) used batteries recorded as Tesla.

66 of 108 battery-paired PG&E and SCE installs (61.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1417
Panasonic13257
JA Solar22
General Electric11
REC1not in top list
Inverter makerTesla2937
Enphase11266
SolarEdge466
FranklinWH1not in top list
Fronius1not in top list
Battery makerTesla2226
Enphase16
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 312 of 397 installs, inverters on 397. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1018541EXCITE ENERGY (Limited Liability)CLEARB General Building Contractor; C-10 Electrical ContractorSep 21, 2016Sep 30, 2028397

License numbers are the ones the utilities recorded on the interconnection applications (397 of 397 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1018541. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list EXCITE ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020Total
City and County of San Francisco1018541101
unincorporated Marin County1018541011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
El Dorado255
Placer83
Yolo14
Amador7
Sutter7
Alameda6
San Mateo6
Contra Costa5
San Joaquin3
Solano2
Butte1
Colusa1
Lake1
Marin1
Napa1
Nevada1
Santa Clara1
Tuolumne1
Yuba1

Top cities

CityInstalls
El Dorado Hills166
Shingle Springs22
Rocklin21
Granite Bay19
Cameron Park18
Placerville18
Lincoln15
Rescue15
Auburn12
West Sacramento9
Yuba City6
Loomis4
Newcastle4
Redwood City4
Danville3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EXCITE ENERGY397

Common questions

Where does EXCITE ENERGY install solar?

Its installs are spread across 19 counties. The most are in El Dorado County (255 installs), followed by Placer County (83).

How often does EXCITE ENERGY install batteries with solar?

27.2% of its interconnected solar installs include battery storage across all years, and 84.6% in the last 24 months (33 of 39).

How many EXCITE ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

29 of its 397 interconnected installs (7.3% of the 397 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.