How many solar installs has SOLCORE INC done in California, and which license number is on its installs?

SOLCORE INC has 105 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Jan 7, 2025 to Aug 27, 2026), most of them in El Dorado County (18), Placer County (16) and Riverside County (14). CSLB lists license 1123152 (SOLCORE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
105
Last 24 months
105
Total capacity
890.4 kW DC
Median system size
7.8 kW DC
With battery storage
99.0% all time; 99.0% last 24 months
Third-party owned
32.4% of 105 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
104 installs, latest Aug 27, 2026
Ownership types recorded
PPA 34
Median battery size
13.5 kWh (75 installs list a capacity)
First install
Jan 7, 2025
Latest install
Aug 27, 2026
Counties
29
Utilities
PGE 79, SCE 26
CSLB license
1123152

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20256060
2026 (through Aug 31, 2026)4544

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

104 of its 105 interconnected installs (99.0% of the 105 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011.0%1 (100.0%)
Net Billing Tariff10499.0%103 (99.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 34 of SOLCORE INC’s installs the utility recorded a third-party ownership type: PPA 34, lease 0, prepaid lease 0, other 0. Across all installers, 3 residential systems list a third-party owner name that matches SOLCORE INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
lightreach22
light reach4
Solcore Inc3
Good Leap1
GoodLeap1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 105 of SOLCORE INC’s 105 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (36, 34.3%) used modules recorded as LONGi.

In the last 24 months, 105 of SOLCORE INC’s 105 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (92, 87.6%) used inverters recorded as Tesla.

In the last 24 months, 97 of SOLCORE INC’s 105 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (81, 83.5%) used batteries recorded as Tesla.

97 of 104 battery-paired PG&E and SCE installs (93.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi3636
JA Solar2828
Trina Solar1717
Qcells99
Silfab99
Inverter makerTesla9292
Enphase1515
FranklinWH33
SolarEdge33
Sigenergy11
Battery makerTesla8181
Enphase77
FranklinWH33
Telsa33
Enphanse11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 105 of 105 installs, inverters on 105. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLCORE INC as developer on 85 battery storage projects and as installer on 79 (78 name it as both), 86 projects in all with 1,219 kWh of storage. 6 have the status Paid, with $71,353 in current incentive allocations. Applications were received from Apr 3, 2025 to Oct 26, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid6122$71,353
Reserved54752$1,662,772
Pending Reservation12160$386,842
Waitlist226$54,418
Cancelled12158$412,232

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 POU55726$1,802,1860$0
Residential Solar and Storage Equity - AB 209 Non-POU22305$701,4511$21,693
Small Residential Storage6119$16,3803$8,460
Equity Resiliency256$56,4001$30,000
Residential Storage Equity113$11,2001$11,200

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1123152SOLCORE INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJul 2, 2024Jul 31, 2028105

License numbers are the ones the utilities recorded on the interconnection applications (105 of 105 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1123152. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado18
Placer16
Riverside14
San Mateo7
Alameda4
Contra Costa4
Los Angeles4
San Bernardino4
San Joaquin4
Santa Clara4
Fresno3
Yolo3
Marin2
Tulare2
Tuolumne2
Amador1
Humboldt1
Kings1
Lake1
Madera1
Mendocino1
Napa1
Nevada1
Orange1
San Luis Obispo1
Sonoma1
Sutter1
Ventura1
Yuba1

Top cities

CityInstalls
Placerville6
Shingle Springs5
Hemet4
Loomis4
Palm Desert4
Stockton4
Auburn3
La Puente3
Lincoln3
Pacifica3
Rocklin3
San Jose3
Adelanto2
Cameron Park2
Colfax2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLCORE INC105

Common questions

Where does SOLCORE INC install solar?

Its installs are spread across 29 counties. The most are in El Dorado County (18 installs), followed by Placer County (16).

How often does SOLCORE INC install batteries with solar?

99.0% of its interconnected solar installs include battery storage across all years, and 99.0% in the last 24 months (104 of 105).

How many SOLCORE INC installs are under NEM 3.0 (the Net Billing Tariff)?

104 of its 105 interconnected installs (99.0% of the 105 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.