Option One Corporation

How many solar installs has Option One Corporation done in California, and which license number is on its installs?

Option One Corporation has 652 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Aug 9, 2013 to Apr 22, 2026), most of them in San Bernardino County (402), Riverside County (70) and San Diego County (69). CSLB lists license 985340 (OPTION ONE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
652
Last 24 months
9
Total capacity
5,067.9 kW DC
Median system size
7 kW DC
With battery storage
1.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
1.7% of 604 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Apr 22, 2026
Ownership types recorded
PPA 8, other 2
Median battery size
13.5 kWh (7 installs list a capacity)
First install
Aug 9, 2013
Latest install
Apr 22, 2026
Counties
9
Utilities
SCE 569, SDGE 80, PGE 3
CSLB license
985340

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
2014380
2015791
2016550
2017782
2018750
20191250
20201264
2021330
202290
2023220
202430
202530
2026 (through Aug 31, 2026)50

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 652 interconnected installs (1.8% of the 652 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Apr 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021332.7%not counted
NEM 2.042765.5%6 (1.6%)
Net Billing Tariff121.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of Option One Corporation’s installs the utility recorded a third-party ownership type: PPA 8, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Option One Corporation exactly.

Third-party owner named on its installsInstalls
SOLKRAFT5
Option One Solar4
Sunnova Energy Corporation1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of Option One Corporation’s 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 88.9%) used modules recorded as HDHYUNDAIENERGYSOLUTIONSCO.,LTD..

In the last 24 months, 9 of Option One Corporation’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 77.8%) used inverters recorded as Tesla.

In the last 24 months, none of Option One Corporation’s 9 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHDHYUNDAIENERGYSOLUTIONSCO.,LTD.8not in top list
CertainTeed1not in top list
Inverter makerTesla712
EcoFlow1not in top list
ShenzhenGrowattNewEnergyCo.,Lt1not in top list
Battery makerTesla04
LG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 581 of 652 installs, inverters on 652. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Option One Corporation as developer on 113 battery storage projects and as installer on 10 (10 name it as both), 113 projects in all with 2,383 kWh of storage. 46 have the status Paid, with $1,057,442 in current incentive allocations. Applications were received from May 1, 2017 to Jul 22, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid461,049$1,057,442
Reserved22345$564,505
Pending Reservation579$159,070
Cancelled38872$864,733
RRF Rejected237$6,631

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency531,503$1,514,32331$852,572
Residential Solar and Storage Equity - AB 209 Non-POU34462$898,8715$132,188
Small Residential Storage16227$66,7398$34,139
Residential Storage Equity5114$89,6271$9,860
Residential Solar and Storage Equity - AB 209340$76,1911$28,682
Not stated237$6,6310$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
985340OPTION ONE SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJul 22, 2013Jul 31, 2027583

License numbers are the ones the utilities recorded on the interconnection applications (587 of 652 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 985340. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Option One Corporation’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202320242025Total
unincorporated San Diego County985340131131212

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino402
Riverside70
San Diego69
Los Angeles52
Orange47
Kern9
El Dorado1
Mendocino1
Ventura1

Top cities

CityInstalls
Apple Valley171
Victorville45
Hesperia42
San Diego20
Phelan18
Helendale14
Oak Hills13
Barstow11
Palm Springs11
Fallbrook9
Fontana8
San Bernardino8
Huntington Beach7
Lancaster7
Corona6

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
OPTION ONE CORPORATION379
Option One Corporation226
OPTION ONE41
Option One Corp.5
Option One1

Common questions

Where does Option One Corporation install solar?

Its installs are spread across 9 counties. The most are in San Bernardino County (402 installs), followed by Riverside County (70).

How often does Option One Corporation install batteries with solar?

1.2% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Option One Corporation installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 652 interconnected installs (1.8% of the 652 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.