TIMEPROOFUSA

How many solar installs has TIMEPROOFUSA done in California, and which license number is on its installs?

TIMEPROOFUSA has 177 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Oct 21, 2025 to Aug 28, 2026), most of them in Riverside County (99), Los Angeles County (43) and San Bernardino County (29). CSLB lists license 1125771 (TIMEPROOFUSA) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
177
Last 24 months
177
Total capacity
703.6 kW DC
Median system size
3.6 kW DC
With battery storage
2.8% all time; 2.8% last 24 months
Third-party owned
0.0% of 177 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
169 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (5 installs list a capacity)
First install
Oct 21, 2025
Latest install
Aug 28, 2026
Counties
8
Utilities
SCE 171, PGE 6
CSLB license
1125771

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
2025421
2026 (through Aug 31, 2026)1354

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

169 of its 177 interconnected installs (95.5% of the 177 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.084.5%2 (25.0%)
Net Billing Tariff16995.5%3 (1.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on TIMEPROOFUSA’s installs. No residential system in the file lists a third-party owner name that matches TIMEPROOFUSA exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 177 of TIMEPROOFUSA’s 177 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (76, 42.9%) used modules recorded as Canadian Solar.

In the last 24 months, 177 of TIMEPROOFUSA’s 177 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (176, 99.4%) used inverters recorded as Enphase.

In the last 24 months, 5 of TIMEPROOFUSA’s 177 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Tesla.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar7676
JinkoSolar4040
JA Solar3232
Hyundai1313
PEIMAR88
Inverter makerEnphase176176
Tesla11
Battery makerTesla55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 177 of 177 installs, inverters on 177. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1125771TIMEPROOFUSA (Limited Liability)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorAug 29, 2024Aug 31, 2028177

License numbers are the ones the utilities recorded on the interconnection applications (177 of 177 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1125771. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Riverside99
Los Angeles43
San Bernardino29
Kern2
Napa1
Placer1
Santa Clara1
Solano1

Top cities

CityInstalls
San Jacinto27
Corona21
Winchester19
Compton17
Altadena16
Lake Elsinore16
Upland16
Palm Springs12
Yucaipa12
Palmdale8
Desert Hot Springs4
Bakersfield2
American Canyon1
Azusa1
Fairfield1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TIMEPROOFUSA177

Common questions

Where does TIMEPROOFUSA install solar?

Its installs are spread across 8 counties. The most are in Riverside County (99 installs), followed by Los Angeles County (43).

How often does TIMEPROOFUSA install batteries with solar?

2.8% of its interconnected solar installs include battery storage across all years, and 2.8% in the last 24 months (5 of 177).

How many TIMEPROOFUSA installs are under NEM 3.0 (the Net Billing Tariff)?

169 of its 177 interconnected installs (95.5% of the 177 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.