SUN AT WORK ELECTRIC INC

How many solar installs has SUN AT WORK ELECTRIC INC done in California, and which license number is on its installs?

SUN AT WORK ELECTRIC INC has 310 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jun 24, 2019 to Jun 23, 2026), most of them in Placer County (53), San Joaquin County (47) and El Dorado County (42). The license number recorded on most of its installs, 1061572, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
310
Last 24 months
21
Total capacity
3,019.5 kW DC
Median system size
9 kW DC
With battery storage
10.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 66.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.9% of 310 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
29 installs, latest Jun 6, 2025
Ownership types recorded
PPA 8, lease 1
Median battery size
10 kWh (6 installs list a capacity)
First install
Jun 24, 2019
Latest install
Jun 23, 2026
Counties
31
Utilities
PGE 305, SCE 4, SDGE 1
CSLB license
1061572

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201920
2020431
2021772
2022651
2023823
20243221
202584
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

29 of its 310 interconnected installs (9.4% of the 310 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 6, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.028190.6%7 (2.5%)
Net Billing Tariff299.4%25 (89.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 9 of SUN AT WORK ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 8, lease 1, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches SUN AT WORK ELECTRIC INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Everbright3
light reach2
Sun at Work Electric2
Sun at Work1
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 19 of SUN AT WORK ELECTRIC INC’s 21 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 31.6%) used modules recorded as CertainTeed.

In the last 24 months, 21 of SUN AT WORK ELECTRIC INC’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 61.9%) used inverters recorded as Enphase.

In the last 24 months, 14 of SUN AT WORK ELECTRIC INC’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 57.1%) used batteries recorded as Tesla.

30 of 32 battery-paired PG&E and SCE installs (93.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed630
LONGi424
Qcells296
Solaria2not in top list
Trina Solar2not in top list
Inverter makerEnphase13279
Tesla813
FranklinWH1not in top list
PointGuard Energy Inc.1not in top list
SolarEdge131
Battery makerTesla813
Enphase412
FranklinWH12
PointGuard Energy Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 251 of 310 installs, inverters on 310. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUN AT WORK ELECTRIC INC as developer on 7 battery storage projects and as installer on 7 (5 name it as both), 9 projects in all with 333 kWh of storage. 5 have the status Paid, with $165,224 in current incentive allocations. Applications were received from Aug 1, 2020 to Apr 22, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid5174$165,224
Cancelled4158$148,500

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency7306$299,2244$154,024
Large-Scale Storage113$3,3000$0
Residential Storage Equity113$11,2001$11,200

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1061572Not found in the CSLB License Master file pulled Nov 4, 2026308

License numbers are the ones the utilities recorded on the interconnection applications (310 of 310 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SUN AT WORK ELECTRIC INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020Total
unincorporated Marin County106157211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Placer53
San Joaquin47
El Dorado42
Contra Costa19
Solano19
Butte17
Amador16
Calaveras15
Nevada10
Sonoma9
Yolo8
Tehama6
Yuba6
Glenn5
Sutter5
Alameda4
Fresno4
Tuolumne4
Merced3
Stanislaus3
Mendocino2
Napa2
Santa Clara2
Ventura2
Colusa1
Marin1
Orange1
San Benito1
San Bernardino1
San Diego1
Shasta1

Top cities

CityInstalls
Stockton25
Lincoln14
Auburn11
Placerville11
Fairfield9
El Dorado Hills8
Rocklin8
Copperopolis7
Santa Rosa7
Manteca6
Paradise6
Ione5
Jackson5
Loomis5
Meadow Vista5

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUN AT WORK ELECTRIC INC306
Sun at Work Electric2
Sun At Work Electric1
SUN AT WORK ELECTRIC1

Common questions

Where does SUN AT WORK ELECTRIC INC install solar?

Its installs are spread across 31 counties. The most are in Placer County (53 installs), followed by San Joaquin County (47).

How often does SUN AT WORK ELECTRIC INC install batteries with solar?

10.4% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (14 of 21). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUN AT WORK ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

29 of its 310 interconnected installs (9.4% of the 310 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.