ILUM ENERGY SOLUTIONS

How many solar installs has ILUM ENERGY SOLUTIONS done in California, and which license number is on its installs?

ILUM ENERGY SOLUTIONS has 578 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Mar 21, 2023 to Aug 28, 2026), most of them in Kern County (110), San Luis Obispo County (74) and Alameda County (61). CSLB lists license 1092865 (ILUM ENERGY SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
578
Last 24 months
302
Total capacity
4,493.8 kW DC
Median system size
6.8 kW DC
With battery storage
51.0% all time; 92.4% last 24 months
Third-party owned
0.2% of 578 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
272 installs, latest Aug 28, 2026
Ownership types recorded
PPA 1
Median battery size
13.5 kWh (91 installs list a capacity)
First install
Mar 21, 2023
Latest install
Aug 28, 2026
Counties
39
Utilities
PGE 486, SCE 92
CSLB license
1092865

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
20232495
20244323
2025159151
2026 (through Aug 31, 2026)127116

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

272 of its 578 interconnected installs (47.1% of the 578 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0111.9%not counted
NEM 2.029551.0%24 (8.1%)
Net Billing Tariff27247.1%263 (96.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of ILUM ENERGY SOLUTIONS’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ILUM ENERGY SOLUTIONS exactly.

Third-party owner named on its installsInstalls
SOLWERKS1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 298 of ILUM ENERGY SOLUTIONS’ 302 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (96, 32.2%) used modules recorded as JA Solar.

In the last 24 months, 302 of ILUM ENERGY SOLUTIONS’ 302 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (202, 66.9%) used inverters recorded as Enphase.

In the last 24 months, 277 of ILUM ENERGY SOLUTIONS’ 302 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (150, 54.2%) used batteries recorded as Enphase.

289 of 295 battery-paired PG&E and SCE installs (98.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar9696
Qcells78114
LONGi6674
Elin Energy30not in top list
Canadian Solar15not in top list
Inverter makerEnphase202477
Tesla114116
Delta Electronics45
SolarEdge412
Fronius3not in top list
Battery makerEnphase150164
Tesla126126
IQBATTERY-5P-1P-NA11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 540 of 578 installs, inverters on 578. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1092865ILUM ENERGY SOLUTIONS (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 16, 2022Jun 30, 2028577

License numbers are the ones the utilities recorded on the interconnection applications (578 of 578 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1092865. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ILUM ENERGY SOLUTIONS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023202420252026Total
City and County of San Francisco109286532308
unincorporated San Diego County10928651011113

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Kern110
San Luis Obispo74
Alameda61
Santa Clara30
Contra Costa29
Santa Barbara29
Los Angeles27
Shasta25
Orange18
San Joaquin16
Riverside14
Fresno11
Yolo11
Placer10
San Bernardino10
Butte9
San Mateo9
Sonoma9
Lake7
Madera7
El Dorado6
Solano6
Calaveras5
Kings5
Napa5
Ventura5
Marin4
Merced4
Yuba4
Monterey3
Sutter3
San Francisco2
Tehama2
Tulare2
Tuolumne2
Glenn1
Mendocino1
Nevada1
Santa Cruz1

Top cities

CityInstalls
Bakersfield75
Oakland24
Santa Maria24
San Jose17
Nipomo14
San Luis Obispo13
Arroyo Grande12
Paso Robles11
Stockton11
Livermore10
Fremont9
Anderson8
Atascadero8
Redding8
Fresno7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ILUM ENERGY SOLUTIONS577
Ilum Energy Solutions1

Common questions

Where does ILUM ENERGY SOLUTIONS install solar?

Its installs are spread across 39 counties. The most are in Kern County (110 installs), followed by San Luis Obispo County (74).

How often does ILUM ENERGY SOLUTIONS install batteries with solar?

51.0% of its interconnected solar installs include battery storage across all years, and 92.4% in the last 24 months (279 of 302).

How many ILUM ENERGY SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

272 of its 578 interconnected installs (47.1% of the 578 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.