How many solar installs has HelioPower done in California, and which license number is on its installs?

HelioPower has 2,148 residential solar installs interconnected in California, active in the records from 2003 through 2020 (Sep 5, 2003 to Oct 30, 2020), most of them in Riverside County (984), San Diego County (487) and San Bernardino County (226). The license number recorded on most of its installs, 915598, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,148
Last 24 months
0
Total capacity
14,688.1 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
54.1% of 1,358 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 623, lease 14, prepaid lease 1, other 97
First install
Sep 5, 2003
Latest install
Oct 30, 2020
Counties
26
Utilities
SCE 1,455, SDGE 556, PGE 137
CSLB license
915598

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200360
2004510
2005500
2006720
2007770
2008460
2009980
20102140
20113140
20122290
20132640
20142350
20152300
20161740
2017550
2018170
2019110
202050
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 2,148 interconnected installs with a tariff recorded (2,148) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02,08096.8%not counted
NEM 2.0683.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 735 of HelioPower’s installs the utility recorded a third-party ownership type: PPA 623, lease 14, prepaid lease 1, other 97. Across all installers, 19 residential systems list a third-party owner name that matches HelioPower exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunRun, Inc.611
Kilowatt Systems, LLC50
Sun Run38
Heliopower12
My Solar 1 LLC3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 676 of HelioPower’s 2,148 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (221, 32.7%) used modules recorded as Hyundai.

Across all years, 1,957 of HelioPower’s 2,148 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,063, 54.3%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai0221
Canadian Solar0183
LG068
SunPower055
Qcells048
Inverter makerSMA01,063
SolarEdge0755
Enphase085
SunPower019
Xantrex Technology Inc.017

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 676 of 2,148 installs, inverters on 1,957. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names HelioPower as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 240 kWh of storage. 1 have the status Paid, with $194,400 in current incentive allocations. Applications were received from Dec 18, 2014 to Dec 18, 2014.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1240$194,400

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated1240$194,4001$194,400

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
915598Not found in the CSLB License Master file pulled Nov 4, 20261,469

License numbers are the ones the utilities recorded on the interconnection applications (1,469 of 2,148 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list HelioPower’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182020Total
unincorporated San Diego County915598527

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside984
San Diego487
San Bernardino226
Orange195
Los Angeles111
Contra Costa22
San Mateo19
Alameda13
Solano12
Napa11
Santa Clara10
Placer9
Sonoma8
Ventura7
San Francisco6
Yolo6
Marin5
San Joaquin4
Kern3
Monterey3
El Dorado2
Butte1
Lake1
Mendocino1
Sutter1
Tulare1

Top cities

CityInstalls
Rancho Mirage156
Murrieta144
San Diego131
Palm Desert125
San Bernardino105
Temecula100
Fallbrook66
Palm Springs57
Indian Wells52
Escondido50
Corona49
Menifee33
Cathedral City31
Oceanside31
Wildomar30

Names as recorded by the utilities

The utilities recorded this installer under 18 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HELIOPOWER907
HelioPower582
HelioPower, Inc.281
Heliopower228
HELIOPOWER, INC65
HELIOPOWER INC48
HelioPower, Inc11
HelioPower Inc.7
HelioPower INC.6
Heliopower, Inc.4
heliopower2
helioPower1
HelioPower , Inc.1
Heliopower Inc1
HelioPower Inc1
helioPower, Inc1
HelioPower, INC1
HelioPower,Inc.1

Common questions

Where does HelioPower install solar?

Its installs are spread across 26 counties. The most are in Riverside County (984 installs), followed by San Diego County (487).

How often does HelioPower install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many HelioPower installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 2,148 interconnected installs with a tariff recorded (2,148) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.