High Definition Solar

How many solar installs has High Definition Solar done in California, and which license number is on its installs?

High Definition Solar has 2,433 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Sep 20, 2013 to Jul 16, 2026), most of them in Alameda County (503), Contra Costa County (468) and Solano County (247). CSLB lists license 949189 (HIGH DEFINITION SOLAR CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,433
Last 24 months
190
Total capacity
8,658.3 kW DC
Median system size
2.9 kW DC
With battery storage
7.6% all time; 67.4% last 24 months
Third-party owned
0.0% of 2,433 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
161 installs, latest Jul 16, 2026
Ownership types recorded
none recorded
First install
Sep 20, 2013
Latest install
Jul 16, 2026
Counties
24
Utilities
PGE 2,433
CSLB license
949189

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013400
20141760
20152430
20162850
20172530
20182340
20192340
20202070
202118319
20221833
202316212
20246236
202512789
2026 (through Aug 31, 2026)4426

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

161 of its 2,433 interconnected installs (6.6% of the 2,433 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.9% of those include battery storage. The latest Net Billing Tariff install was approved Jul 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.081533.5%not counted
NEM 2.01,45759.9%55 (3.8%)
Net Billing Tariff1616.6%111 (68.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on High Definition Solar’s installs. No residential system in the file lists a third-party owner name that matches High Definition Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 140 of High Definition Solar’s 190 installs name a module maker in the “Generator Manufacturer” fields, and most of those (128, 91.4%) used modules recorded as LONGi.

In the last 24 months, 190 of High Definition Solar’s 190 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (190, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 99 of High Definition Solar’s 190 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (96, 97.0%) used batteries recorded as Enphase.

126 of 185 battery-paired PG&E and SCE installs (68.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi128130
Canadian Solar601,760
Qcells44
Sharp2not in top list
Trina Solar293
Inverter makerEnphase1902,433
Tesla55
Fronius44
SMA3not in top list
SolarEdge29
Battery makerEnphase96130
Tesla33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,934 of 2,433 installs, inverters on 2,433. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names High Definition Solar as developer on 19 battery storage projects and as installer on 18 (18 name it as both), 19 projects in all with 236 kWh of storage. 8 have the status Paid, with $69,518 in current incentive allocations. Applications were received from May 4, 2020 to May 1, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8110$69,518
Cancelled9107$69,942
RRF Rejected219$3,680

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency8120$119,7073$61,471
Small Residential Storage878$13,6685$8,047
Large-Scale Storage119$6,0850$0
Not stated219$3,6800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
949189HIGH DEFINITION SOLAR CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJun 24, 2010Jun 30, 20282,362

License numbers are the ones the utilities recorded on the interconnection applications (2,371 of 2,433 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 949189. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list High Definition Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco949189151914149136283
unincorporated Marin County94918955220000014

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Alameda503
Contra Costa468
Solano247
Sonoma209
San Mateo197
San Francisco173
San Joaquin159
Napa141
Santa Clara124
Marin115
Yolo33
El Dorado15
Placer15
Santa Cruz12
Lake5
Stanislaus5
Sutter3
Amador2
Yuba2
Mendocino1
Monterey1
Nevada1
Sacramento1
San Benito1

Top cities

CityInstalls
Oakland178
San Francisco173
Napa109
Stockton84
Vallejo78
Fairfield76
Berkeley72
San Jose69
Santa Rosa69
Petaluma62
Castro Valley56
Antioch47
Pacifica40
Richmond40
El Cerrito39

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
High Definition Solar1,402
HIGH DEFINITION SOLAR CONSTRUCTION1,016
HIGH DEFINITION SOLAR8
HIgh Definition Solar3
high Definition Solar1
High Definition solar1
HIGH DEFINITION SOLAR INC1
High Definition Solar`1

Common questions

Where does High Definition Solar install solar?

Its installs are spread across 24 counties. The most are in Alameda County (503 installs), followed by Contra Costa County (468).

How often does High Definition Solar install batteries with solar?

7.6% of its interconnected solar installs include battery storage across all years, and 67.4% in the last 24 months (128 of 190).

How many High Definition Solar installs are under NEM 3.0 (the Net Billing Tariff)?

161 of its 2,433 interconnected installs (6.6% of the 2,433 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.