All on Electric

How many solar installs has All on Electric done in California, and which license number is on its installs?

All on Electric has 1,175 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Dec 6, 2010 to Aug 26, 2026), most of them in Contra Costa County (493), Alameda County (278) and San Joaquin County (177). CSLB lists license 944973 (ALL ON ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,175
Last 24 months
116
Total capacity
8,585.5 kW DC
Median system size
6.7 kW DC
With battery storage
11.6% all time; 69.0% last 24 months
Third-party owned
1.8% of 1,175 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
125 installs, latest Aug 26, 2026
Ownership types recorded
PPA 12, lease 8, prepaid lease 1
Median battery size
13.5 kWh (86 installs list a capacity)
First install
Dec 6, 2010
Latest install
Aug 26, 2026
Counties
22
Utilities
PGE 1,174, SCE 1
CSLB license
944973

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201110
2012100
2013150
2014650
2015770
2016751
2017730
2018631
2019731
20201527
20211132
202214815
202314313
20246725
20256949
2026 (through Aug 31, 2026)3022

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

125 of its 1,175 interconnected installs (10.6% of the 1,175 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.024721.0%not counted
NEM 2.080368.3%48 (6.0%)
Net Billing Tariff12510.6%85 (68.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 21 of All on Electric’s installs the utility recorded a third-party ownership type: PPA 12, lease 8, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches All on Electric exactly.

Third-party owner named on its installsInstalls
SFE Solar Energy Inc11
The solar Quote7
Solar Harmonics2
SFE1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 110 of All on Electric’s 116 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (50, 45.5%) used modules recorded as REC.

In the last 24 months, 116 of All on Electric’s 116 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (73, 62.9%) used inverters recorded as Tesla.

In the last 24 months, 69 of All on Electric’s 116 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (59, 85.5%) used batteries recorded as Tesla.

114 of 136 battery-paired PG&E and SCE installs (83.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC5093
Canadian Solar14131
Hyundai13not in top list
Qcells11not in top list
JA Solar8not in top list
Inverter makerTesla7376
Enphase25253
SolarEdge21534
Qcells4not in top list
SunPower4314
Battery makerTesla5961
Enphase613
FranklinWH2not in top list
LG111
SunPower121

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,101 of 1,175 installs, inverters on 1,175. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names All on Electric as developer on 4 battery storage projects and as installer on 5 (4 name it as both), 5 projects in all with 70 kWh of storage. 1 have the status Paid, with $3,358 in current incentive allocations. Applications were received from Dec 13, 2017 to Dec 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$3,358
Cancelled461$10,532

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage570$13,8901$3,358

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
944973ALL ON ELECTRIC INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMar 27, 2010Apr 30, 20271,148

License numbers are the ones the utilities recorded on the interconnection applications (1,148 of 1,175 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 944973. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list All on Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023Total
City and County of San Francisco944973011226
unincorporated Marin County944973101002

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa493
Alameda278
San Joaquin177
Santa Clara68
San Mateo49
Sonoma25
Solano20
Merced14
Stanislaus12
Fresno9
San Benito7
San Francisco6
Calaveras4
Napa3
Tulare2
Tuolumne2
Kern1
Kings1
Madera1
Marin1
Monterey1
Yolo1

Top cities

CityInstalls
Brentwood164
Livermore113
Tracy66
Stockton50
Pleasanton45
Antioch39
Concord34
Manteca34
Walnut Creek32
San Jose30
San Ramon30
Dublin29
Oakley26
Pleasant Hill26
Oakland24

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALL ON ELECTRIC INC744
All on Electric196
All On Electric127
ALL ON ELECTRIC84
all on electric12
All on Electric, Inc.4
All On Electric Inc3
All on electric2
All On electric1
All on Electric Inc.1
All On Electric Inc.1

Common questions

Where does All on Electric install solar?

Its installs are spread across 22 counties. The most are in Contra Costa County (493 installs), followed by Alameda County (278).

How often does All on Electric install batteries with solar?

11.6% of its interconnected solar installs include battery storage across all years, and 69.0% in the last 24 months (80 of 116).

How many All on Electric installs are under NEM 3.0 (the Net Billing Tariff)?

125 of its 1,175 interconnected installs (10.6% of the 1,175 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.