Evans Energy

How many solar installs has Evans Energy done in California, and which license number is on its installs?

Evans Energy has 1,365 residential solar installs interconnected in California, active in the records from 2015 through 2026 (May 22, 2015 to Aug 5, 2026), most of them in Fresno County (1,067), Madera County (126) and Tulare County (68). CSLB lists license 1000880 (EVANS ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,365
Last 24 months
204
Total capacity
13,107.5 kW DC
Median system size
8.8 kW DC
With battery storage
11.8% all time; 68.6% last 24 months
Third-party owned
0.1% of 1,365 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
172 installs, latest Aug 5, 2026
Ownership types recorded
prepaid lease 1
Median battery size
10 kWh (13 installs list a capacity)
First install
May 22, 2015
Latest install
Aug 5, 2026
Counties
13
Utilities
PGE 1,287, SCE 78
CSLB license
1000880

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201570
2016520
2017760
20181260
20191410
20201180
20211270
20221780
20231980
202417848
20259770
2026 (through Aug 31, 2026)6743

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

172 of its 1,365 interconnected installs (12.6% of the 1,364 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0755.5%not counted
NEM 2.01,11781.9%0 (0.0%)
Net Billing Tariff17212.6%159 (92.4%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Evans Energy’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Evans Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Evans Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 197 of Evans Energy’s 204 installs name a module maker in the “Generator Manufacturer” fields, and most of those (154, 78.2%) used modules recorded as REC.

In the last 24 months, 204 of Evans Energy’s 204 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (203, 99.5%) used inverters recorded as Enphase.

In the last 24 months, 139 of Evans Energy’s 204 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (137, 98.6%) used batteries recorded as Enphase.

159 of 161 battery-paired PG&E and SCE installs (98.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC154306
SEG Solar25not in top list
Hyundai10117
Qcells8not in top list
SunPower7not in top list
Inverter makerEnphase2031,332
SunPower723
SMA420
SolarEdge330
Fronius26
Battery makerEnphase137158
IQ enphase11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,251 of 1,365 installs, inverters on 1,365. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1000880EVANS ENERGY (Corporation)CLEARC-10 Electrical ContractorFeb 7, 2015Jun 30, 20271,364

License numbers are the ones the utilities recorded on the interconnection applications (1,365 of 1,365 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1000880. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno1,067
Madera126
Tulare68
Kings51
Merced18
Mariposa15
Kern6
San Joaquin6
San Luis Obispo2
Stanislaus2
Tuolumne2
Butte1
Placer1

Top cities

CityInstalls
Fresno514
Clovis383
Madera99
Sanger60
Kingsburg54
Hanford38
Visalia29
Reedley28
Merced17
Lemoore12
Coarsegold10
Mariposa10
Selma9
Dinuba8
Friant8

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EVANS ENERGY985
Evans Energy380

Common questions

Where does Evans Energy install solar?

Its installs are spread across 13 counties. The most are in Fresno County (1,067 installs), followed by Madera County (126).

How often does Evans Energy install batteries with solar?

11.8% of its interconnected solar installs include battery storage across all years, and 68.6% in the last 24 months (140 of 204).

How many Evans Energy installs are under NEM 3.0 (the Net Billing Tariff)?

172 of its 1,365 interconnected installs (12.6% of the 1,364 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.