CLEAN-POWER2N

How many solar installs has CLEAN-POWER2N done in California, and which license number is on its installs?

CLEAN-POWER2N has 236 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Feb 12, 2024 to Aug 28, 2026), most of them in Los Angeles County (150), San Bernardino County (27) and Orange County (25). CSLB lists license 1041317 (CLEAN-POWER2N) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
236
Last 24 months
215
Total capacity
1,315.9 kW DC
Median system size
5.3 kW DC
With battery storage
79.7% all time; 79.5% last 24 months
Third-party owned
0.0% of 236 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
235 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
15 kWh (185 installs list a capacity)
First install
Feb 12, 2024
Latest install
Aug 28, 2026
Counties
8
Utilities
SCE 227, PGE 9
CSLB license
1041317

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20243623
20253822
2026 (through Aug 31, 2026)162143

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

235 of its 236 interconnected installs (99.6% of the 236 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010.4%0 (0.0%)
Net Billing Tariff23599.6%188 (80.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CLEAN-POWER2N’s installs. No residential system in the file lists a third-party owner name that matches CLEAN-POWER2N exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 215 of CLEAN-POWER2N’s 215 installs name a module maker in the “Generator Manufacturer” fields, and most of those (200, 93.0%) used modules recorded as RNG International.

In the last 24 months, 215 of CLEAN-POWER2N’s 215 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (150, 69.8%) used inverters recorded as SolaX Power Network Technology.

In the last 24 months, 153 of CLEAN-POWER2N’s 215 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (131, 85.6%) used batteries recorded as SolaX Power Network Technology (Zhe jiang) Co., Ltd..

153 of 188 battery-paired PG&E and SCE installs (81.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerRNG International200218
Suzhou Talesun Solar Technologies1214
Renogy44
Qcells33
Canadian Solar1not in top list
Inverter makerSolaX Power Network Technology150150
RNG International2949
Hoymiles2121
Enphase1212
Growatt22
Battery makerSolaX Power Network Technology (Zhe jiang) Co., Ltd.131131
Solax power1515
SolaX Power Network Technology (Zhejiang) Co., Ltd44
Tesla22
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 236 of 236 installs, inverters on 236. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CLEAN-POWER2N as developer on 0 battery storage projects and as installer on 150 (0 name it as both), 150 projects in all with 1,973 kWh of storage. 26 have the status Paid, with $753,362 in current incentive allocations. Applications were received from Jul 13, 2025 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid26342$753,362
Reserved1021,341$2,965,679
Pending Reservation792$203,593
Waitlist12158$349,353
Cancelled340$93,627

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU1501,973$4,365,61426$753,362

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1041317CLEAN-POWER2N (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 29, 2018Jun 30, 2028236

License numbers are the ones the utilities recorded on the interconnection applications (236 of 236 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1041317. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles150
San Bernardino27
Orange25
Riverside25
Alameda3
Santa Clara3
San Mateo2
Merced1

Top cities

CityInstalls
Rowland Heights19
West Covina14
Walnut13
Eastvale12
Irvine11
Monterey Park11
Diamond Bar10
Chino Hills9
El Monte9
Temple City9
Alhambra8
Arcadia8
La Puente8
Corona7
San Gabriel6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CLEAN-POWER2N236

Common questions

Where does CLEAN-POWER2N install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (150 installs), followed by San Bernardino County (27).

How often does CLEAN-POWER2N install batteries with solar?

79.7% of its interconnected solar installs include battery storage across all years, and 79.5% in the last 24 months (171 of 215).

How many CLEAN-POWER2N installs are under NEM 3.0 (the Net Billing Tariff)?

235 of its 236 interconnected installs (99.6% of the 236 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.