CE ENERGY SERVICES INC

How many solar installs has CE ENERGY SERVICES INC done in California, and which license number is on its installs?

CE ENERGY SERVICES INC has 197 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Jul 25, 2024 to Aug 31, 2026), most of them in Los Angeles County (72), Orange County (64) and San Bernardino County (34). CSLB lists license 986864 (CE ENERGY SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
197
Last 24 months
196
Total capacity
1,659.4 kW DC
Median system size
7.7 kW DC
With battery storage
96.4% all time; 96.9% last 24 months
Third-party owned
76.6% of 197 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
196 installs, latest Aug 31, 2026
Ownership types recorded
PPA 19, other 132
Median battery size
13.5 kWh (188 installs list a capacity)
First install
Jul 25, 2024
Latest install
Aug 31, 2026
Counties
8
Utilities
SCE 193, PGE 4
CSLB license
986864

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202410
20254443
2026 (through Aug 31, 2026)152147

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

196 of its 197 interconnected installs (99.5% of the 197 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010.5%0 (0.0%)
Net Billing Tariff19699.5%190 (96.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 151 of CE ENERGY SERVICES INC’s installs the utility recorded a third-party ownership type: PPA 19, lease 0, prepaid lease 0, other 132. No residential system in the file lists a third-party owner name that matches CE ENERGY SERVICES INC exactly.

Third-party owner named on its installsInstalls
GoodLeap130
LightReach17
GoodLeap TPO4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 196 of CE ENERGY SERVICES INC’s 196 installs name a module maker in the “Generator Manufacturer” fields, and most of those (165, 84.2%) used modules recorded as Qcells.

In the last 24 months, 196 of CE ENERGY SERVICES INC’s 196 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (157, 80.1%) used inverters recorded as Tesla.

In the last 24 months, 190 of CE ENERGY SERVICES INC’s 196 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (157, 82.6%) used batteries recorded as Tesla.

190 of 190 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells165165
JA Solar2727
LONGi33
Hyundai11
REC1not in top list
Inverter makerTesla157157
Enphase2324
SolarEdge1616
Fronius11
Battery makerTesla157157
Enphase1818
SolarEdge1313
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 197 of 197 installs, inverters on 197. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
986864CE ENERGY SERVICES INC (Corporation)CLEARC-10 Electrical ContractorSep 14, 2013Jun 30, 2028197

License numbers are the ones the utilities recorded on the interconnection applications (197 of 197 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 986864. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles72
Orange64
San Bernardino34
Riverside22
Fresno2
Kings1
San Joaquin1
Ventura1

Top cities

CityInstalls
Lake Forest11
Lancaster9
Fontana8
Rancho Santa Margarita8
Corona7
Brea6
Orange6
Palmdale6
Glendora5
Lakewood4
Mission Viejo4
Altadena3
Apple Valley3
Castaic3
Cerritos3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CE ENERGY SERVICES INC197

Common questions

Where does CE ENERGY SERVICES INC install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (72 installs), followed by Orange County (64).

How often does CE ENERGY SERVICES INC install batteries with solar?

96.4% of its interconnected solar installs include battery storage across all years, and 96.9% in the last 24 months (190 of 196).

How many CE ENERGY SERVICES INC installs are under NEM 3.0 (the Net Billing Tariff)?

196 of its 197 interconnected installs (99.5% of the 197 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.